My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD BLDG 40-26 2026-01-16
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 40-26
>
3003 W CASINO RD BLDG 40-26 2026-01-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2026 10:17:28 AM
Creation date
12/22/2025 11:20:20 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 40-26
Permit
M2407-078
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LEGEND <br /> 3 3.5 4 4.5 5 <br /> GENERAL NOTES <br /> MATCH LINE _ <br /> SEE DRAWING 1 M21 <br /> N <br /> Lv z o <br /> =10 o REFERENCE DRAWINGS <br /> I � o <br /> N � o <br /> fl GRILLE 14'-6" AFF TYP 42x50 TUNNEL <br /> G2:24"x10" o <br /> GRILLE 6'-10° FF SHEET NOTES <br /> TYP RG 1 3 SHIM <br /> O O 5 7 9 2 18x2gD q PROVIDE DUCT MOUNTED SMOKE DETECTOR IN <br /> O O 101P3 G 26 513 VERTICAL DUCT WITHIN 5'-0" OF FIRE SMOKE DAMPER. <br /> TYR 4 TG N 20x18 4 x <br /> 800 CFM -- <br /> 2 20x10 20x14 FC I <br /> 22x18 22x18 7 � 16 GA. GALV. WIRE SCREE x <br /> 12x10 8 POC T 50"4 SUPPLY / COVER FAN INTAKE W/ 1" MESH <br /> 22x18 ZEE <br /> RG 10 20x10 2 x14 TOUC42"x TRANSITION x AF 9F 12 AFF CONSTRUCTION NOTES <br /> a <br /> 3 O 11 12 20x14 UP LVDR 16/12 CUT OFF AT 1 A �� ESx16 ON CAP OPEN DUCT WITH LIKE KIND MATERIAL. <br /> SHIM HOP�� a 14 IT 101P4 50"4OC v <br /> 04P3 7 84 DUST CD Ty 15 1 2 EXISTING AHU-25 SERVING ROOM TO HAVE REBALANCED <br /> B 13 1 300 CFM 3 ST IRPR4 A AIRFLOW AS INDICATED ON SHEET MOe. INCLUDE THE <br /> s3 1 M26 M565 NMaa 16/12 CUT OFF AT 14' A o o O REBALANCING OF AIRFLOW FOR DUCT RUNS ASSOCIATED <br /> -�—- F' WITH RHC-3 AND RHC-4. REFER TO SHEET MOH2 FOR <br /> 120 DUST AIRFLOWS TO BE USED, PER REHEAT COIL SCHEDULE. <br /> 4 FOR SEQUENCE OF� 16x12 EXHAUST DUCT P <br /> 6 OPERATION, SEE 1 TYP 24x12 UP � � OWNER FURNISHED, CONTRACTOR INSTALLED DUST <br /> 1M26 M300 24x16 SUPPLY DUCT UP SEE AND FOR DETAIL COLLECTOR. MOUNT ON EXISTING CONCRETE CURB. <br /> DUST TO HVAC 28 1M26 M535 1M26 M535 <br /> COLLECTOR ®CONNECT DUST COLLECTION DUCT TO DUST COLLECTOR <br /> 24/16 CUT OFF AT 13' AFF PER MANUFACTURER'S INSTALLATION INSTRUCTIONS. <br /> ROUTE DUCT AT ONE ELEVATION THROUGH EXTERIOR <br /> A WALL WITH WEATHERPROOF, SS FLASHING AT OPENING. <br /> 26 PROVIDE E OF <br /> WALL PENETRATION WITH O SAME MATERIAL R INTERIOR ID AS DUCT. <br /> 7 TERMINATE WITH FANGED END FOR LATER CONNECTION DUST COLLECTION DUCT AT ELEVATION 6-12 INCHES <br /> BELOW CEILING. SUPPORT DUCTWORK WITH CABLE <br /> TO FUTURE FLEX DUCT DOWN TO FUTURE PANEL MOUNTING SYSTEM FROM STRUCTURE ABOVE. <br /> ROUTER. PROVIDE SLIDE GATE NEAR TERMINATION AND <br /> UTILIZE TO BALANCE ROOM AIR FLOW INTO DUCT AT ©PROVIDE DUCT MANUFACTURER'S CLEANOUT DOOR WITH <br /> 1,600 CFM. OPENING ON BOTH SIDES OF ELBOW FOR INSPECTION <br /> AND CLEANING. IN DUCTWORK LARGER THAN 10" DIA., <br /> ®TERMINATE WITH FLANGED END FOR FLEX DUCT ACCESS DOORS/OPENINGS EVERY 50 FT AND AFTER <br /> CONNECTION. PROVIDE SLIDE GATE NEAR FLANGED EVERY ELBOW (TURN) WILL BE ACCEPTABLE AS A <br /> END AND UTILIZE TO BALANCE AIRFLOW TO 1,600 CFM, MEANS OF SATISFYING NFPA REQUIREMENTS PER <br /> FLEX DUCT TO PANEL ROUTER BY VENDOR/SUPPLIER. 02/14/24 BOEING CONVERSATION WITH CITY OF EVERETT <br /> D IRE RSH L. <br /> 1 5 G 401025 9 11 <br /> 11' <br /> B D <br /> PARTIAL FIRST FLOOR HVAC PLAN 0.9 T <br /> N <br /> SCALE:1/8"=1'-O" FINISH FLOOR EL 100'-0" N 1 1 M 10 11 M 1 1 1 1 M 12 1 1 M 13 1 1 M 14 M <br /> *� - o <br /> N.3 I <br /> r1M <br /> 1M16 1M17 1M18 �1M19 <br /> C�N.7 <br /> 1 1 M21 1 1 M22 1 1 M23 1 1 M24* m <br /> P <br /> 1M25 M2 1M27 1M28 1M29 <br /> — R <br /> FUTURE BLDG 40-027 <br /> * DENOTES PLANS <br /> BUILDING 40-026 NOT INCLUDED <br /> KEY PLAN IN THIS DWG. <br /> SET <br /> SCALE: NONE <br /> 'Affiliated <br /> Am Engineers ISSUED FOR CONSTRUCTION <br /> Arfumted Enymae,m- 4' 2' 0 4' 8' 12' 16' 20' <br /> 5802 Research Park Boulevard <br /> Madison Wisconsin 53719 <br /> PROFESSIONAL STAMP&SIGNATURE APPLIES TO WORK Tel 608.,238.2616 DESIGN BY AEI DATE 02.21.24 <br /> WITHIN THE CLOUDED REVISION AREAS ONLY AS INDICATED PrfeCl <br /> SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE <br /> ACCEPTABILITY R.ANDERSON 02.21.24 PARTIAL FIRST FLOOR HVAC PLAN W8861360 D 02.21.24 <br /> RECORD DRAWING ISSUED TO OWNER FEW FPW 09.29.97 - RECORD DRAWING ISSUED TO OWNER 565973-02 AEI 07.31.09 Ffi a THIS DESIGN AND/OR CHECKED <br /> F"'^'N,�y SPECIFICATION IS APPROVED P. ROEDL 02ENGINEER .21.24 SHEET o <br /> R 777 ML DEMO VERIZON OFFICE J# 535442-84 JHB FB/BAO 10.20.04 D 737 NORTH LINE-40-26 TOWER RELOCATIONS DP 26.02 W8861360 AEI B. FRIEDMAN 02.21.24 oA�.M z APPROVED BY DEPT. DATE TITLE 737 NORTH LINE - 40-26 TOWER RELOCATIONS DP 26.02 1 M26 <br /> A DEMO BURN LAB J#54684842 JM BOC 12.01.04 BOE//VG DHECKEo <br /> B RECORD DRAWING CLEAN-UP J# 555672-04 DLR GROUP KAP 10.14.05 ,^� � APPROVED BUILDING 40-026 JOB NO. COMP NO. <br /> B. FRIEDMAN 02.21.24 <br /> C BEE- ISSUE FOR CONSTRUCTION 565973_02 AEI 07.16.07 °'ia'_4 APPROVED MECHANICAL MASTER COL. P-R/3-5 EVERETT, WA DWG NO. 40-026-1M26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.