My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD TANK BLDG 40-26 2026-01-16
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 40-26
>
3003 W CASINO RD TANK BLDG 40-26 2026-01-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2026 10:18:20 AM
Creation date
12/22/2025 11:25:46 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Unit
TANK
Tenant Name
BLDG 40-26
Notes
M2407-044
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Skanska USA Building Project:4223004 737 North Line Construction <br /> 5 KAN S KA 400 Fairview Ave North 3003 West Casino Road, Everett,WA 98203 <br /> Suite 1000 Everett,Washington 98203 <br /> Seattle,Washington 98109 KPFF Note: <br /> P: (206)726-8000 Per Procore, this is submittal 22 21 09-1.1 <br /> F: (206)328-9235 Did not receive email notification for this submittal. <br /> Transmittal #222106- �- Process Water Pump (40-26 WTC) <br /> To Sara Ibarra(KPFF Consulting Engineers(WA)) From Luke Zachman(Skanska USA Building Inc. (WA)) <br /> Mark Gosnold(The Boeing Company) <br /> 737 Logan Ave N <br /> Renton,Washington 98055 <br /> Frederick Gella(The Boeing Company) <br /> 737 Logan Ave N <br /> Renton,Washington 98055 <br /> Date Created May 30,2024 <br /> Copies To Gabe Hughes(Skanska USA Building Inc.(WA)) <br /> Transmit Attached Sent Via Attached <br /> Submitted For Approval Action As Noted Resubmitted Due to KPFF 06/06/24 <br /> Due By 06/04/24 <br /> Sent date 05/30/24 <br /> Transmittal Items <br /> Comments <br /> Attached please find the following UMC submittal for review and approval regarding the Process Water Hydro Pneumatic tank referenced in the Wing <br /> Tank Cleanout IFC Drawing Set, DWG. MOF,MOI and M584. <br /> The following items are included in this submittal package: <br /> • 2.3 Expansion Tank-HT-01 Wessels SS-FXA 500. <br /> MM <br /> awwtdw,N+Coa.�e RPO*V#ldit This submittal has been reviewed for <br /> Luke Zachman general conformance with the <br /> ftAewedNocarww M Project Intern contract documents. Mechanical <br /> ns engineer's review does not relieve <br /> the vendor/subcontractor of <br /> .c,c..rec wr SI responsibility for compliance with all <br /> "°O CM*k SA(0F*(W rx%% ""r""4 d J� S�bn+tLal r#�n�lr+ requirements of the contract, including <br /> mpaneMp Aar asm+�e b�i f..a�ran DOtursb 222106-002-1 [N G I N!r R S completeness and accuracy of <br /> .,a..wreory conwucrrn a s waa 1.rwnr r p Y <br /> ow.�.. *;�.wr�,rapa� this submittal. <br /> Skanska lob Number- 4223004-515 06/05/2024 <br /> Skanska USA Building Page 1 of 1 Printed On:May 30,2024 11:37 AM PDT <br />
The URL can be used to link to this page
Your browser does not support the video tag.