My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6919 EVERGREEN WAY MEMOS MEXICAN RESTAURANT 2026-01-05
>
Address Records
>
EVERGREEN WAY
>
6919
>
MEMOS MEXICAN RESTAURANT
>
6919 EVERGREEN WAY MEMOS MEXICAN RESTAURANT 2026-01-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2026 8:56:52 AM
Creation date
12/23/2025 9:22:33 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
6919
Tenant Name
MEMOS MEXICAN RESTAURANT
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Miguel Ortega <br /> TEKAS Fire & Hood Installations, LLC <br /> Plan Check Number: M2110-081, First Building Review <br /> November 8, 2021 <br /> Comments <br /> 1. The proposed project may require modifications to the building, including but not limited to the <br /> roof and ceiling framing, and the wall supporting the hood. A separate building permit <br /> application is required for building modifications. See IBC Section 105.1. <br /> 2. Continuing with the previous comment, modifications to the structural system will require <br /> structural drawings and calculations prepared by a professional engineer licensed in the state of <br /> Washington. See IBC Section 107.1, and RCW Sections 18.43.010, 18.43.020, and 18.43.070. <br /> 3. Typical Section B/M1 shows the installation of the new hood and MAU on the roof of the <br /> building. See IBC Section 107.2.1. The following comments should be addressed: <br /> a. The plans should include a roof plan showing the location of the MAU. <br /> b. The building is a converted house with a steep slope that is anticipated to be framed with <br /> roof joists. The section shows a standard flat roof with trusses, and is not valid. A section <br /> specific to the proposed work should be included. <br /> c. The weights of the hood and MAU should be specified in the drawings. Calculations <br /> evaluating the strength of the roof to support the units should be submitted for review. See <br /> IEBC Section 806.2. <br /> d. The MAU is located on a sloped roof and is required to have a service platform complying <br /> with IMC Section 306.5.1. <br /> 4. The submittal documents include generic manufacturer requirements for suspending the hood. <br /> Details specific to the project for connecting the hood to the structure above should be included <br /> in the construction drawings. See IBC Sections 107.2.1 and 1604.1. <br /> 5. The building construction appears to be wood framing. The hood is required to have a <br /> minimum 18-inch clearance to combustible materials. Alternatively, reduced clearance <br /> construction is required peer IMC Table 308.4.2. See IMC Section 507.2.6. <br /> 6. Section A/M1 shows the zero-clearance duct wrap extending not more than 18-inches below the <br /> roof framing. The duct is anticipated to be located against a wall. The wrap should extend for <br /> the full height of the duct. See IMC Section 506.3.6. <br /> 7. Up-blast fans serving Type I hoods shall be installed with a hinge, restraint, and flexible <br /> electrical cable to permit inspection and cleaning. These do not appear to be specified. The <br /> drawing should be revised. See IMC 506.5.3. <br /> 3200 Cedar Street © 425.257.8810 O everetteps@everettwa.gov <br /> Everett,WA 98201 425.257.8857 fax everettwa.gov/permits <br /> Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.