Laserfiche WebLink
Page 3 of 45State of Washington Department of Ecology <br />Agreement No: <br />Project Title: <br />Recipient Name: <br />WQC-2026-EverPW-00408 <br />City of Everett Port Gardner Water Quality Program – Phase 2 Construction <br />City of Everett <br /> <br />RECIPIENT INFORMATION <br />Organization Name: <br />Federal Tax ID: <br />UEI Number: LVPSLN4A2LF6 <br />Mailing Address: <br />Physical Address: <br />Contacts <br />Organization Email: <br />Organization Fax: <br /> <br />City of Everett <br />91-6001248 <br />3200 Cedar St. <br />Everett, Washington 98201 <br />3200 Cedar St. <br />Everett, Washington 98201 <br /> <br />Zach Brown <br />Senior Engineer <br />3200 Cedar St. <br />Everett, Washington 98201 <br />Email: zbrown@everettwa.gov <br />Phone: (425) 257-8872 <br />Authorized <br />Signatory <br />Mi Young Lee <br />Financial Analyst <br />3200 Cedar St. <br />Everett, Washington 98201 <br />Email: mlee@everettwa.gov <br />Phone: (425) 257-8971 <br />Billing Contact <br />Project Manager <br />Authorized <br />Signatory <br />Angelique Thompson <br />Capital Program Fund Manager <br />3200 Cedar St. <br />Everett, Washington 98201 <br />Email: aathompson@everettwa.gov <br />Phone: (425) 257-8922 <br /> <br />aathompson@everettwa.gov <br />(425) 257-8945 <br />Template Version 12/10/2020 <br />Docusign Envelope ID: D814CB0A-309D-42B0-8AE7-7273045711DF