Laserfiche WebLink
Description of Date(s):July 16, 2025 <br /> Violation and codes <br /> violated:(Notice(s) A Notice of Violation and Order was issued on July 16, 2025 with a <br /> of Violation and/or compliance date of January 19, 2026. <br /> other enforcement <br /> document(s)issued EMC Provision(s)Violated: <br /> are attached to this The lack of handrails on the exterior stairs of the property is a violation <br /> Agreement) of International Property Maintenance Code (IPMC) 307.1, which <br /> reads: <br /> IPMC 307.1, Handrails and guardrails. <br /> Every exterior and interior flight of stairs having more than four risers <br /> shall have a handrail on one side of the stair and every open portion of <br /> a stair, landing, balcony, porch, deck, ramp or other walking surface <br /> that is more than 30 inches (762 mm) above the floor or grad below <br /> shall have guards. Handrails she be not less than 30 inches(762 mm)in <br /> height or more than 42 inches (1067 mm) in height measured vertically <br /> above the nosing of the tread or above the finished floor of the landing <br /> or walking surfaces. Guards shell be not less than 30 inches(762 mm)in <br /> height above the floor of the landing, balcony, porch, deck, or ramp or <br /> other walking surface. <br /> Corrective Action(s) By:April 20,2026 <br /> Required and • Submit complete permit applications to City of Everett Permit <br /> Compliance Services for all the necessary and required permits to correct all <br /> Schedule for of the violations cited above. Information on the City of Everett <br /> Corrective Action(s) permit application process and required documents can be <br /> found online at www.everettwa.gov/permits. <br /> • Once permits are obtained,correct and complete all of the <br /> deficiencies that are present. <br /> • Obtain final inspection approval by Permit Services for all <br /> permits. <br /> [remainder of page blank;Agreement continues on following page] <br /> Page 2 of 6 <br />