Laserfiche WebLink
LEGEND INSTRUMENTATION DESIGNATION <br /> AUTOMATIC FLOW CONTROL VALVE WITH XX GPM PRESSURE M BUTTERFLY VALVE HOSE BIBB HS HAND SWITCH <br /> XX GPM INDEPENDENT FLOW CONTROL CARTRIDGE. LA LEVEL ALARM <br /> FEMALE CAMLOCK COUPLER 41 BALL VALVE ❑ SWIVEL JOINT LAH, LAE LEVEL ALARM HIGH, <br /> MALE CAMLOCK COUPLER H,� STRAINER LEVEL ALARM LOW <br /> XJ MANUAL 3—WAY VALVE LAHH, LALL LEVEL ALARM HIGH—HIGH, <br /> II FLANGE CONNECTION LEVEL ALARM LOW—LOW <br /> *�, PRESSURE SAFETY VALVE LI LEVEL INDICATOR <br /> REDUCER AUTOMATIC MODULATING VALVE LSH, LSL LEVEL SWITCH HIGH, <br /> LEVEL SWITCH LOW <br /> ► QUICK DISCONNECT AW AQUEOUS WASH LSHH, LSLL LEVEL SWITCH HIGH—HIGH, <br /> FACTORY FLOOR AWW AQUEOUS WASH WASTE LEVEL SWITCH LOW—LOW <br /> N NPA FLEX HOSE AWWD AQUEOUS WASH WASTE DRAIN LT LEVEL TRANSMITTER <br /> Pj�N �N <br /> F���R y W INDUSTRIAL WASTE PI PRESSURE INDICATOR <br /> FLOOR F�ODR gTCy FV FLOW VALVE DID QUICK DISCONNECT <br /> FS FLOW SWITCH UA GENERAL ALARM <br /> POSITION 3 POSITION 3 YS EVENT SWITCH <br /> SUPPLY POINT COLLECTION POINT TRENCH/PIT YY EVENT RELAY <br /> CAPPED <br /> Iw <br /> 4"AWWD SEE M324 FOR CONT. <br /> SEQUENCE OF OPERATIONS: POSITION 3 <br /> SEE SHEET 40-026—M326 <br /> REFERENCE DRAWINGS <br /> 1. 40-026—M314 <br /> 2. 40-026—M602 <br /> 2. 40-026—E936-2A <br /> 4"AWW° 3',w GENERAL NOTES <br /> B 1 SEE SHEET 40-026—M334 FOR PUMPED <br /> PROCESS COLD WATER FLOW DIAGRAM <br /> 3"IW VENT <br /> 4"AWWD CONDUCTIVITY 18" MANWAY 4"V 4" BLIND FLANGE <br /> PROBE LEVEL FOR FUTURE WASTE <br /> 4"AWWD Fcv SENSOR TANK CONNECTION <br /> 302 41W-7 <br /> DRAIN <br /> 3D1 Q FUTURE INSTRUMENTATION <br /> C01 NO HHIGH IGH HIGHLEVE LEVEL <br /> k �3"IW I„ -L CONSTRUCTION NOTES <br /> � II II <br /> HIGH LEVEL — PUMP ON <br /> 1"AWWD ST <br /> TO DRAIN 4 <br /> LOW LEVEL — LEAD PUMP ON <br /> 4" ISOLATION VALVE <br /> \aa a \aa a <br /> LOW LOW LEVEL — PUMP OFF <br /> FOR PUMP CONTROL LEVELS SEE - <br /> WASTE TANK DETAILS M318 M553 A <br /> 4"IW <br /> � <br /> 1"AWWD 3A WB <br /> TO DRAIN <br /> YS <br /> 3000 GALLON AQUEOUS INDUSTRIAL <br /> ON GEAR PIT WALL WASH WASTE TANK FMCS WASTE PUMPS <br /> O <br /> POSITION 3 AQUEOUS WASH PROCESS FLOW DIAGRAM <br /> SCALE: NTS M325 M450 <br /> ISSUED FOR CONSTRUCTION <br /> PROFESSIONAL STAMP & SIGNATURE ENGINEERS <br /> APPLIES TO WORK WITHIN THE CLOUDED Seattle//Spokane//Baltimore DESIGN BY FSi DATE 03.14.24 <br /> REVISION AREAS ONLY AS INDICATED <br /> SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE DRAWN SUBTITLE CURRENT REVISION SYMBOL DATE <br /> 0 C84O ACCEPTABILITY <br /> BIDIT LSiECKED 10 Ds 17 POSITION 3 AQUEOUS WASH <br /> q c E PSG <br /> 10 Ds T7 PROCCESS FLOW DIAGRAM W8861360 B o3.14.z4 <br /> A Aqueous Wash Pos 3—RECORD WBS 252 CBJ FSG 12.18.19 .P°� "� SPECIFICATION IS APPROVED SHEET <br /> B 737 NORTH LINE— 40-26 WING TANK CLEANOUT W8861360 FSi KMC 03.14.24BOE//VG® e APPROVED BY DEFT. DATE PSG 10 O6 17 TITLE 737 NORTH LINE — 40-26 WING TANK CLEANOUT M314 1 <br /> NECKED <br /> F /sT3R APPROVED BUILDING 40-026 JOB N0. COMP N0. <br /> FSS/ONPL ENG WBS 252 <br /> APPROVED MECHANICAL MASTER EVERETT, WA DWG No. 40-026—M314-1 <br />