Laserfiche WebLink
INDEX OF DRAWINGS <br /> INADRAW <br /> INCLUDED INCLUDE <br /> I IN SET IN SET <br /> ING NO, SHEET NO, DRAWING TITLE REV DATE DRAWING NO. SHEET NO. DRAWING TITLE REV DATE DRAWING NO, SHEET NO. DRAWING TITLE REV DATE <br /> GENERAL_ MECHANICAL I MECHANICAL (CONT) <br /> • 40-026-GOc-6 GOc-6 COVER SHEET ORIG 03,14.24 • 40-026-MOA MOA MECHANICAL LEGEND & ABBREVIATIONS Q 03,14.24 • 40-026-M337 M337 PROCESS CONTROL DIAGRAMS AND SEQUENCE ORIG 03.14.24 ISSUE LEGEND <br /> • 40-026-G2p-6 G2p-6 INDEX OF DRAWINGS ORIG 03.14.24 • 40-026-MOBR MOBR PLUMBING SCHEDULES - REMOVAL P 03 14.24 • 40-026-M338 M338 PROCESS CONTROL DIAGRAMS AND SEQUENCE ORIG 03,14.24 <br /> • 40-026-MOIR MOIR EQUIPMENT SCHEDULES AND SPECIFICATIONS - REMOVAL C 03 14.24 • 40-026-M454 M454 ENLARGED HVAC PLAN C 03.14.24 NOT YET ISSUED <br /> • 40-026-UGM115R UGM115R PARTIAL UNDERGROUND PLUMBING PLAN - REMOVAL E 03 14.24 • 40-026-M547 M547 PIPING DETAILS C 03,14.24 <br /> • 40-026-UGM116R UGM116R PARTIAL UNDERGROUND PLUMBING PLAN - REMOVAL F 03 14.24 • 40-026-M550 M550 TUNNEL DETAILS A 03.14.24 PREVIOUSLY ISSUED, BUT <br /> ARCHITECTURAL • 40-026-UGM117R UGM117R PARTIAL UNDERGROUND PLUMBING PLAN - REMOVAL F 03 14.24 • 40-026-M567 M567 HVAC DETAILS C 03,14.24 NOT IN THIS ISSUE <br /> • 40-026-UGM12OR UGM12OR PARTIAL PLUMBING PLAN - TUNNELS - REMOVAL C 03 14.24 • 40-026-M581 M581 MISCELLANEOUS DETAILS A 03.14.24 • INCLUDED IN THIS ISSUE <br /> • 40-026-TNA16R TNA16R PARTIAL TUNNEL PLAN - REMOVAL B 03.14.24 • 40-026-UGM121R UGM121R PARTIAL PLUMBING PLAN - TUNNELS - REMOVAL D 03 14.24 • 40-026-M584 M584 PIPE SUPPORT DETAILS - POSITION #4 B 03,14.24 <br /> • 40-026-TNA21R TNA21R PARTIAL TUNNEL PLAN - REMOVAL A 03.14.24 • 40-026-UGM122R UGM122R PARTIAL UNDERGROUND PLUMBING PLAN - REMOVAL F 03 14.24 • 40-026-M604 M604 MISC PIPING DETAILS B 03.14.24 <br /> • 40-026-TNA16 TNA16 PARTIAL TUNNEL PLAN B 03.14.24 • 40-026-UGM123R UGM123R PARTIAL UNDERGROUND PLUMBING PLAN - REMOVAL F 03 14.24 • 40-026-M700 M700 PLAN - LANDING GEAR PIT DETAILS J 03,14.24 PREL PRELIMINARY ISSUE <br /> • 40-026-TNA21 TNA21 PARTIAL TUNNEL PLAN A 03.14.24 • 40-026-UGM128R UGM128R PLUMBING PLAN - REMOVAL E 03 14.24 • 40-026-M700A M700A PLAN - LANDING GEAR PIT DETAILS H 03.14.24 FOR REVIEW OR <br /> • 40-026-A634 A634 FENCING DETAILS ORIG 03.14.24 • 40-026-UGM508R UGM508R TUNNEL SECTIONS - REMOVAL C 03 14.24 • 40-026-M700B M700B PLAN - LANDING GEAR PIT DETAILS C 03,14.24 INFORMATION ONLY <br /> • 40-026-IM128R IM128R PARTIAL FIRST FLOOR PLUMBING PLAN - REMOVAL K 03 14.24 NOT FOR CONSTRUCTION <br /> • 40-026-IM129R IM129R PARTIAL FIRST FLOOR PLUMBING PLAN - REMOVAL F 03 14.24 <br /> • 40-026-2M129R 2M129R PARTIAL SECOND FLOOR PLUMBING PLAN - REMOVAL D 03 14.24 ORIG ORIGINAL ISSUE <br /> STRUCTURAL • 40-026-M314R M314R PIPING AND INSTRUMENTATION DIAGRAM AQUEOUS C 03 14.24 FOR PERMIT, BID, <br /> WASH AND INDUSTRIAL WASTE SYSTEM - REMOVAL E L E C T R C A L PROCUREMENT OR <br /> • 40-026-IS60-16R IS60-16R PARTIAL PLAN - SLAB ON GRADE - REMOVAL B 03.14.24 • 40-026-M314-IR M314-IR POSITION 3 AQUEOUS WASH PROCESS FLOW DIAGRAM B 03 14.24 <br /> • 40-026-IS60-17R IS60-17R PARTIAL PLAN - SLAB ON GRADE - REMOVAL B 03.14.24 - REMOVAL • 40-026-EOA EOA ELECTRICAL LEGEND, SYMBOLS AND ABBREVIATIONS E 03.14,24 <br /> • 40-026-IS60-16 IS60-16 PARTIAL PLAN - SLAB ON GRADE B 03.14.24 • 40-026-M324R M324R POSITION 4 AQUEOUS WASH PROCESS FLOW DIAGRAM B 03 14.24 • 40-026-2E129R 2E129R PARTIAL SECOND FLOOR 480Y/277V POWER PLAN D 03.14,24 DRAWING REVISION -• 40-026-IS60-17 IS60-17 PARTIAL PLAN - SLAB ON GRADE B 03.14.24 - REMOVAL - REMOVAL SEE SPECIFIC DRAWING <br /> • 40-026-S305 S305 CONCRETE DETAILS CRIS 03.14.24 • 40-026-M454R M454R ENLARGED HVAC PLAN - REMOVAL C 03 14.24 • 40-026-TNEIIO-16 TNEIIO-16 480Y/277V POWER PLAN - TUNNEL C 03.14 24 FOR NATURE OF <br /> • 40-026-S668-2 S668-2 MISCELLANEOUS DETAILS - FOR REF ONLY - - • 40-026-M458R M458R AQUEOUS WASH ENLARGED PLAN - REMOVAL B 03 14.24 • 40-026-TNEIIO-21 TNEIIO-21 480Y/277V POWER PLAN - TUNNEL A 03.14 24 REVISION <br /> • 40-026-M459R M459R AQUEOUS WASH ENLARGED PLAN - REMOVAL B 03 14.24 • 40-026-TNE216 TNE216 PARTIAL TUNNEL/TRENCH EMCS PLAN A 03.14 24 <br /> • 40-026-M547R M547R PIPING DETAILS - REMOVAL C 03 14.24 • 40-026-TNE221 TNE221 PARTIAL TUNNEL/TRENCH EMCS PLAN A 03.14 24 <br /> • 40-026-M55OR M550R TUNNEL DETAILS - REMOVAL A 03 14.24 • 40-026-2E129 2E129 PARTIAL SECOND FLOOR 480Y/277V POWER PLAN D 03.14 24 <br /> • 40-026-M567R M567R HVAC DETAILS - REMOVAL C 03 14.24 • 40-026-2E229 2E229 PARTIAL SECOND FLOOR EMCS PLAN D 03.14 24 <br /> • 40-026-M58OR M58OR AQUEOUS WASH - PIPING DETAILS AND SECTIONS A 03 14.24 • 40-026-E549-2 E549-2 ISLET DETAILS - FLOW DAY 7 A 03.14 24 <br /> - REMOVAL • 40-026-E549-3 E549-3 ISLET DETAILS - FLOW DAY 8 A 03.14 24 <br /> • 40-026-M581R M581R MISCELLANEOUS DETAILS - REMOVAL A 03,14.24 • 40-026-E549-5 E549-5 ISLET DETAILS - HIGH HIGH ALARM LIGHT ORIG 03.14 24 <br /> • 40-026-M583R M583R PIPE SUPPORT DETAILS - POSITION #4 - REMOVAL A 03 14.24 • 40-026-E621-1 E621-1 BUSWAY SCHEDULES - 4V26-2ATNP6-A A 03.14 24 <br /> • 40-026-M584R M584R PIPE SUPPORT DETAILS - POSITION #4 - REMOVAL B 03 14.24 • 40-026-E624-1 E624-1 BP-3A BOM AND PANEL LAYOUT ORIG 03.14 24 <br /> • 40-026-M70OR M70OR PLAN - LANDING GEAR PIT DETAILS AT FINAL G 03 14.24 • 40-026-E624-2 E624-2 BP-3A TERMINAL LAYOUT ORIG 03.14 24 <br /> ASSEMBLY POSITION #6 - REMOVAL • 40-026-E624-3 E624-3 BP-3A DIAGRAM ORIG 03.14 24 <br /> • 40-026-M70OAR M700AR PLAN - LANDING GEAR PIT DETAILS AT FINAL F 03 14.24 • 40-026-E624-4 E624-4 BP-3A VFD WIRING DIAGRAM ORIG 03.14 24 <br /> ASSEMBLY POSITION #3,5 - REMOVAL 01 40-026-E625-1 E625-1 BP-36 BOM AND PANEL LAYOUT ORIG 03.14 24 <br /> • 40-026-MOB MOB PLUMBING SCHEDULES P 03 14.24 • 40-026-E625-2 E625-2 BP-313 TERMINAL LAYOUT ORIG 03.14 24 <br /> • 40-026-MOF MOF PLUMBING SCHEDULE D 03,14.24 • 40-026-E625-3 E625-3 BP-36 DIAGRAM ORIG 03.14 24 <br /> • 40-026-MOI Vol EQUIPMENT SCHEDULES AND SPECIFICATIONS C 03 14.24 • 40-026-E625-4 E625-4 BP-313 VFD WIRING DIAGRAM ORIG 03.14 24 <br /> • 40-026-UGMI10 UGMI10 PARTIAL UNDERGROUND PLUMBING PLAN F 03 14.24 • 40-026-E626-1 E626-1 SP-88 ELEVATION ORIG 03.14 24 <br /> • 40-026-UGMIII UGMIII PARTIAL UNDERGROUND PLUMBING PLAN G 03 14.24 • 40-026-E626-2 E626-2 SP-88 PANEL BOM ORIG 03.14 24 <br /> • 40-026-UGM112 UGM112 PARTIAL UNDERGROUND PLUMBING PLAN F 03 14.24 • 40-026-E626-3 E626-3 SP-88 TERMINAL BLOCK LAYOUT ORIG 03.14 24 <br /> • 40-026-UGMI15 UGMI15 PARTIAL UNDERGROUND PLUMBING PLAN E 03 14.24 • 40-026-E626-4 E626-4 SP-88 CONTROL WIRING DIAGRAM ORIG 03.14 24 <br /> • 40-026-UGM116 UGM116 PARTIAL UNDERGROUND PLUMBING PLAN F 03,14.24 • 40-026-E626-5 E626-5 SP-88 CONTROL DIAGRAM ORIG 03.14 24 <br /> • 40-026-UGM117 UGM117 PARTIAL UNDERGROUND PLUMBING PLAN F 03 14.24 • 40-026-E627-1 E627-1 SP-89 ELEVATION ORIG 03.14 24 <br /> • 40-026-UGM118 UGM118 PARTIAL UNDERGROUND PLUMBING PLAN G 03 14.24 • 40-026-E627-2 E627-2 SP-89 PANEL BOM ORIG 03.14 24 <br /> • 40-026-UGM120 UGM120 PARTIAL PLUMBING PLAN - TUNNELS C 03 14.24 • 40-026-E627-3 E627-3 SP-89 TERMINAL BLOCK LAYOUT ORIG 03.14 24 <br /> • 40-026-UGM121 UGM121 PARTIAL PLUMBING PLAN - TUNNELS D 03,14.24 • 40-026-E627-4 E627-4 SP-89 CONTROL WIRING DIAGRAM ORIG 03.14 24 <br /> • 40-026-UGM122 UGM122 PARTIAL UNDERGROUND PLUMBING PLAN F 03 14.24 • 40-026-E627-5 E627-5 SP-89 CONTROL DIAGRAM ORIG 03.14 24 <br /> • 40-026-UGM123 UGM123 PARTIAL UNDERGROUND PLUMBING PLAN F 03,14.24 <br /> • 40-026-UGM126 UGM126 PARTIAL UNDERGROUND PLUMBING PLAN D 03 14.24 <br /> • 40-026-UGM128 UGM128 PLUMBING PLAN F 03,14.24 <br /> g • 40-026-UGM501 UGM501 TUNNEL SECTIONS E 03 14.24 <br /> • 40-026-UGM502 UGM502 TRENCH SECTIONS F 03 14.24 <br /> • 40-026-UGM503 UGM503 TRENCH SECTIONS C 03 14.24 <br /> • 40-026-UGM504 UGM504 TRENCH SECTIONS C 03 14.24 <br /> & • 40-026-UGM508 UGM508 TUNNEL SECTIONS C 03 14.24 <br /> • 40-026-IM79 IM79 PARTIAL FIRST FLOOR HVAC PIPING PLAN C 03 14.24 <br /> • 40-026-IM128 IM128 PARTIAL FIRST FLOOR PLUMBING PLAN J 03 14.24 <br /> • 40-026-IM129 IM129 PARTIAL FIRST FLOOR PLUMBING PLAN F 03 14.24 <br /> • 40-026-2M129 2M129 PARTIAL SECOND FLOOR PLUMBING PLAN D 03 14.24 <br /> i <br /> • 40-026-M314 M314 PIPING AND INSTRUMENTATION DIAGRAM C 03 14.24 <br /> AQUEOUS WASH AND INDUSTRIAL WASTE SYSTEM <br /> • 40-026-M314-1 M314-1 POSITION 3 AQUEOUS WASH PROCESS FLOW DIAGRAM B 03 14.24 <br /> g • 40-026-M324 M324 POSITION 4 AQUEOUS WASH PROCESS FLOW DIAGRAM B 03 14.24 <br /> • 40-026-M333 M333 SANITARY FLOW DIAGRAM ORIG 03,14.24 <br /> • 40-026-M334 M334 COLD WATER CLOW DIAGRAM ORIG 03 14.24 <br /> = 1 <br /> ISSUED FOR CONSTRUCTION <br /> 1601 Sth Avenue,Suite 1600 <br /> Seattle,wA2E1o1 206.622.5822 DESIGN BY KPFF DATE 03.14.24 <br /> 0 <br /> www.kpff.com <br /> SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE \��12� y WIN A SUBTITLE CURRENT REVISION SYMBOL DATE <br /> ACCEPTABILITY B. RowA o3.14.z4 INDEX OF DRAWINGS <br /> oe xa,ri� o W8861360 G RIG <br /> 03.14.24 <br /> o ORIG 737 NORTH LINE- 40-26 WING TANK CLEANOUT W8861360 KPFF E. GEORGE 03.14.24 �,� ^'c,° THIS DESIGN AND/OR S. IBACHECKED <br /> SPECIFICATION IS APPROVED S. BARRA 03.14.24 SHEET SEQUENCE No. <br /> TITLE <br /> v BOE,NG APPROVED BY DEFT. DATE 737 NORTH LINE - 40-26 WING TANK CLEANOUT <br /> CHECKED G� <br /> Yv� -" ENGINEER <br /> 4 BUILDING 40-026 <br /> P�'"�GO�tiRAL8E8G1}�<v APPROVED <br /> �S'SIONAL��G ti E. GEORGE 03.14.24 <br /> \P\ APPROVED ARCHITECTURAL MASTER EVERETT, Wq DWc No. 40-026-G2p-6 <br />