Laserfiche WebLink
LEGEND <br /> 9 1 2 3 GENERAL NOTES <br /> 0 <br /> z <br /> 1�SEE 40-026-M700 FOR SLANT 6 PIPING PLAN <br /> 2" HYDRAULIC 0 2. FOR AIR SYSTEM SEE DRAWING <br /> UGM115 M561 FLUID FILL ;; o TNM111_AIR_COMPOSITE. <br /> MATCH LINE SEE DWG UGM110 0 FOR POTABLE AND PROCESSED WATER SYSTEM SEE <br /> _ _ _ _ _ _ _ _ o_ _ DRAWING TNM110-WTR-COMPOSITE. <br /> z I <br /> SEE 40-026-MOI FOR PIPING SPECIFICATIONS <br /> 1 1/2"A o <br /> 5 M592 0 3�3" BUTTERFLY VALVE: MOO 22121-5114351 <br /> ®SEE DETAIL UGM1151M592 <br /> UGM115 M561 I I <br /> 5�E 3 1 \ I AQUEOUS WASH SYSTEM SHUTOFF CONTROL VALVE: <br /> �UGM115 M700 \ H 1 1 1/2"HS BRAY ELECTRONIC LUG STYLE BUTTERFLY VALVE, 3" <br /> UGM115 M560 SERIES AB WITH 24V ELECTRONIC ACTUATOR, SERIES <br /> 11, <br /> 70. SEE 40-026-M314, M324, AND M325 FOR <br /> 2 //� \ I CONTROL INTERFACE. <br /> UGM115 M562 UGM115 M561 \ / � _ 2"HR2 HS I 6. IN ALL TUNNELS, UTILIDORS, AND TRENCHES WITH <br /> / I HYDRAULIC PIPING (EXCEPT PEDESTRIAN TUNNELS), <br /> / 6\0 PROVIDE THE FOLLOWING FLOOR COATING: <br /> UGM115 M458 \ // �\ \ ', AND SIM <br /> I- NEOGARD 70714/70715 CHEMICAL RESISTANT <br /> gi UGM115 M743 UGM115 M746 I PRIMER: 2 COMPONENT 100% SOLIDS EPDXY RESIN <br /> d� I WITH A CYCOALIPHATIC AMINE HARDENER, AND <br /> 3 \ \\ ,--I"PPCW NEOGARD 70714/70715 100% SOLIDS EPDXY (EP) <br /> UGM115 M562 0I COATING FINISH. <br /> SLANT 6 2"HR2 (2)(2) 2 I 7� SEE STRUCTURAL DRAWING S563, DETAIL X FOR <br /> 1 1/2"A (2) 4 GUIDES. <br /> 1"CW <br /> 2 \ 2 D (wo RLIDS) GM115 M547 I ® SEE STRUCTURAL DRAWING S563, DETAIL X FOR <br /> UGM115 M737 \ Y UGM115 M581 4H3L h 3"PPCW- J ANCHORS. <br /> ------------------------------------------- // - - ----(wa LIDSA-------- ------- -- - <br /> I,�I :II, :I .I, . I, :I :G I I II ,I <br /> — \ ----- ---- <br /> --- --- --- 3„A , <br /> 1'A 2 I I' --------- <br /> „ <br /> YA <br /> 3'A 3'A UGM115 M560 3"A 3'PPCW� <br /> ---- <br /> 1„A (2) O 3 1 1„A (4) 1„q 2) <br /> 2 <br /> 2 1 1/2"q 1 1/2"A (2) <br /> 1 1/2' 1 1/2A (2) UGM115 M583 j r 1"PPCW �o E CONSTRUCTION NOTES <br /> 1 \ TO SLANT 3 <br /> SIM AND 4 \ UGM115 M737 PROVIDE NEW LABEL TO EXISTING PIPE AS <br /> UGM115 M737 1 1/2"HS 2 UGM115 M737 UGM115 M572 I z PUMPED PROCESS COLD WATER" (PPCW). <br /> UGM115 M747 UGM115 M737 2"HR UGM115 M562 II II 1 1/ "HS <br /> SIM AND <br /> 2"HR 1"PPCW I PROVIDE PPCW PIPE AND CONNECT TO EXISTING. <br /> I <br /> j SEE NEW PPCW PIPING ON SHEET M700. <br /> 15 UGM1 M746 UGM115 M74� <br /> 4. FILL IN HYDRAULIC DRAIN TRENCHES. CONSUI I <br /> 1 1/2"HS I ARCHITECT AND BOEING FOR LOCATION AND <br /> ® it 2"HR I EXTENT OF FILL. <br /> L AND MSIM <br /> 2 UGM115 M743 UGM115 M746 <br /> UGM115 M560 <br /> I 1 T <br /> 5 7 T <br /> 11 <br /> 0.9 <br /> B DG 40 25 <br /> dl A I GM11 CUGM1I1UGM1I2UGM11 3JGMI1 N M <br /> UGM115 UGM502 I N.3 <br /> - - - - - - - - - - — — - JGM11 UGM116UGM117UGM118 GM11 <br /> _ _ N.7 Q <br /> MATCH LINE SEE DWG UGM120 I GM12 UGM121UGM122UGM12 GM12 m <br /> III 111 P <br /> �IJGIV1 UGM126UGM127UGM128 2JI <br /> PARTIAL UNDERGROUND PL I 1 11 <br /> R <br /> SCALE: 1/8"=1'-O" FINISH FLOOR EL. 92'-0" U BLDG 40-27 <br /> KEY PLAN N <br /> SCALE: NONE <br /> pk�E <br /> ISSUED FOR CONSTRUCTION 8' 4, 0 4, s, 16' <br /> PROFESSIONAL STAMP & SIGNATURE ERS <br /> APPLIES TO WORK WITHIN THE CLOUDED Seattle//Spokane//Baltimore DESIGN BY FSI DATE 03,14.24 SCALE: 1/8"=1'-0" <br /> REVISION AREAS ONLY AS INDICATED <br /> SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE <br /> 0. cH o THIS R UH cKED -17-92 PARTIAL UNDERGROUND PLUMBING PLAN <br /> RECORD DRAWING ISSUED TO OWNER MGM DJH 06-30-94 D MOVED AIR&WATER TO COMPOSITES - JPO c w+s„q / W8861360 E 03.14.24 0 <br /> .P '�' SPECIFICATION IS APPROVED RKE 7-17-92 SHEET o <br /> A 787 FA RECORD SET 555886 WH J. MENIKETTI 06.22.07 C AQUEOUS WASH POS 3 - RECORD WBS 252 CBJ FSG 12.19.18 ® 5 APPROVED BY DEPT. DATE RKE 7-17-92 TITLE 737 NORTH LINE - 40-26 WING TANK CLEANOUT <br /> BOE//VG CHECKED U G M 115 <br /> B 787 SURGE LINE WH SAG 10.15.12 E 737 NORTH LINE-40-26 WING TANK CLEANOUT W8861360 FSi KMC 03.14.24 LMM 7-17-92 <br /> BUILDING 40-026 <br /> R 1 T. APPROVED JOB N0. COMP NO. <br /> - RECORD SET F 737 NORTH LINE-40-26 HYDRAULICS W8861360 FSi KMC OL25.24 ssoxnL+Nc` LMM 7-17-92 WBS 252 <br /> C 5X5 RATE READINESS- RECORD SET w1426466 WH SAG 05.09.14 APPROVED MECHANICAL MASTER COL. N.3-N.7/0.9-3 EVERETT, WA DWG No. 40-026-UGM115 <br />