My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4512 FOREST DR 2023 A T AND T WIRELESS ANTENNA Plans 2026-01-05
>
Address Records
>
FOREST DR
>
4512
>
A T AND T WIRELESS ANTENNA
>
Plans
>
4512 FOREST DR 2023 A T AND T WIRELESS ANTENNA Plans 2026-01-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2026 11:11:02 AM
Creation date
1/5/2026 11:09:07 AM
Metadata
Fields
Template:
Address Document
Street Name
FOREST DR
Street Number
4512
Tenant Name
A T AND T WIRELESS ANTENNA
Permit
B2305-065
Year
2023
Notes
REPLACE 6 WIRELESS COMMUNICATION ANTENNAS W/9 NEW ANTENNAS
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 2 3 4 5 <br /> GROUNDING PLAN LEGEND. GROUND BUSS BAR NOTE: <br /> --EXISTING GROUND WARE COPPER 1. RURNDY GROUNDING CLAMP REQUIRED TO BOND BUSS BAR TO TOWER G P D GROUP <br /> ---NEW GROUND WIRE �.�.1 GROUND ROD STEEL ATTACH BURNDY CLAMP(GAR3903TC,TESSCO/542362)TO <br /> ROUND MEMBER BELOW BUSS BAR OR PARALLEL TO GROUND BUSS BAR. Professional Corporation <br /> EXOTHERMIC WELD BURNDY CLAMP SHALL NOT BE INSTALLED ABOVE BUSS BAR. <br /> GROUND ROD 2. IF EXISTING BUSS BAR IS TO BE RE-USED,INSTALL BURNDY BONDING SlOSanhlb"n Slrear,SvVe] <br /> jojo�w <br /> MECHANICAL CONNECTION ,o WT TEST WELL STRAP FROM BUSS BAR TO TOWER STEEL AS NOTED ASOVE. F101 <br /> CI 330.5722100 fa.SSO.3W572SI]2101 <br /> EXIST114G 92 AWG GROUND <br /> GENERAL NOTES: DOWN LEAD(FIELD VERIFY) GAMMA <br /> OS• <br /> 1. CONTRACTOR SHALL HAVE A COMPLETE ��/��� <br /> UNDERSTANDING OF THE CONTENTS OF AT&T <br /> STANDARD TP-76416. <br /> 2. ALL GROUNDING CONDUCTORS SHALL PROVIDE A <br /> STRAIGHT DOWTAVARD PATH TO GROUND NTH C2 Mobility <br /> GRADUAL BEND AS REQUIRED,GROUND WIRES SHALL <br /> NOT BE LOOPED OR SHARPLY BENT. 198p1 SW AVENUE, <br /> C 3. KOPRSHIELD ANTI-OXIDATION COMPOUND SHALL BE TUALATIATIN,OR 97062 2110 <br /> USED ON ALL COMPRESSION GROUNDING <br /> CONNECTIONS. B2 <br /> 4. ALL EXOTHERMIC CONNECTIONS SHALL BE INSTALLED <br /> UTILIZING THE PROPER CONNECTION/MOLD AND <br /> MATERIALS FOR THE PARTICULAR APPLICATION. <br /> S. <br /> ALL BOLTED a ec <br /> GROUNDING CONNECTIONS SHALL BE NEW 02 AWG GROUND LEAD FROM <br /> INSTALLED WITH AN EXTERNAL TOOTHED LOCK NEW OVPS TO EXISTING GROUND BAR S <br /> WASHER. WITH <br /> BUS BARS MAY HAVE SEE DETAIL 3 ON SHEET G-2 <br /> PRE-PUNCHED HOLES OR TAPPED HOLES.ALL BETA <br /> Network Solutions <br /> HARDWARE SHALL BE SECURITY TORQUE HARDWARE 255' EXISTING SECTOR GROUND BAR <br /> 31W STAINLESS STEEL ��- LOCATED AT EACH SECTOR 22263 68TH AVENUE SOUTH <br /> 6. EXTERNAL GROUNDING CONDUCTOR SHALL NOT BE (FIELD VERIFY LOCATION) KENT,WA 98032 <br /> INSTALLED OR ROUTED THROUGH HOLES IN ANY SEE DETAIL 6ON SHEET G-2 <br /> METAL OBRCTS,CONDUITS,OR SUPPORTS TO <br /> PRECLUDE ESTABLISHING A MAGNETIC CHOKE POINT. B7 <br /> 7. PLASTIC CLIPS SHALL BE USED TO FASTEN AND <br /> SUPPORT GROUNDING CONDUCTORS.FERROUS At <br /> METAL CLIPS WHICH COMPLETELY SURROUND THE i <br /> GROUNDING TOR SHALL NOT BE USED. <br /> 8. CONTRACTOR SHALL REPAIRIPLACE EXISTING Z z m �a <br /> GROUNDING SYSTEM COMPONENTS DAMAGED DURING ALPHA O ~ Q i <br /> CONSTRUCTION AT THE CONTRACTORS EXPENSE. 150' d w g Z <br /> 9. ALL DETAILS ARE SHOWN IN GENERAL TERMS.ACTUAL EXISTING TOWER TOP O w <br /> INSTALLATION AND CONSTRUCTION MAY VARY DUE TO COLLECTOR GROUND BAR A2 U 01 0 <br /> SITE SPECIFIC CONDITIONS. (FIELD VERIFY LOCATION) to <br /> 10. Lu <br /> GROUND ALL ANTENNABASES,FRAMES,CABLE RUNS, O a a <br /> AND OTHER METALLIC COMPONENTS USING GROUND <br /> LL <br /> WIRES AND CONNECT TO SURFACE MOUNTED BUS o O <br /> BARS,FOLLOW ANTENNA AND BTS MANUFACTURERS z <br /> PRACTICES FOR GROUNDING REQUIREMENTS. r�_] z K <br /> GROUND COAX SHIELD AT BOTH ENDS AND EXIT FROM <br /> iv#-- <br /> TOWER OR POLE USING MANUFACTURERS PRACTICES. lD <br /> 11. ALL WIRES SHALL BE COPPER THHWTHWN.ALL F- <br /> GROUND WIRE SHALL BE GREEN INSULATED WIRE O $ <br /> ABOVEGROUND. ANTENNA GROUNDING DIAGRAM(113'-0"RAD) tF yy <br /> 12. CONTRACTOR TO VERIFY AND TEST GROUND SOURCE, 1 W K m o <br /> GROUNDING AND OTHER OPERATIONAL TESTING WILL SCALE: NOT TOSCALE Z <br /> SE VATNESSED BY WIRELESS REPRESENTATIVE. <br /> 13. REFER TO DIVISION 16 GENERAL ELECTRIC;GENERAL <br /> ELECTRICAL PROVISION AND REQUIREMENTS OFG WITH L ROUNDING STANDARDS. � 1 MM M+]//1.��� <br /> 14. ELECTRICAL CONTRACTOR TO PROVIDE DETAILED <br /> B DESIGN OF GROUNDING SYSTEM,AND RECEIVE / <br /> APPROVAL F DESIGN BY AUTHORIZED WIRELESS <br /> REPRESENTATIVE,PRIOR TO INSTALLATION F <br /> GROUNDING SYSTEM.PHOTO DOCUMENT ALL - <br /> AND � ;- <br /> CADWELDS A GROUND RINGS. G,t A/T��n.1tC <br /> 15. NOTIFY CONSTRUCTION MANAGER IF THERE ARE ANY <br /> DIFFICULTIES INSTALLING GROUNDING SYSTEM DUE <br /> TO SITE SOIL CONDITIONS. SEAL <br /> 16. USE PANI SCHEME FOR LOADING GROUNDS ON MOB <br /> AS DISCUSSED IN NSTO 119.33 S 36. <br /> GAMMA O2 <br /> GROUND ROD NOTES: 45• <br /> 1. ELECTRICAL CONTRACTOR SHALL ORDER GROUND C3 <br /> RESISTANCE TESTING ONCE THE GROUND SYSTEM <br /> HAS BEEN INSTALLED',A QUALIFIED INDMDUAL, ILI to <br /> UTILIZING THE FALL F POTENTIAL METHOD,SHOULD 7 N Z <br /> WILL <br /> PERFORM THE TEST.THE REPORT SHOW THE <br /> LOCATION OF THE TEST AND CONTAIN NO LESS THAN 9 Q a <br /> TEST POINTS ALONG THE TESTING LINE,GRAPHED OUT a. <br /> TO SHOW THE PLATEAU. W �1 C <br /> 2. POINT GROUND TEST OR 3 POINT 62%TESTS WILL NOT f• G <br /> BE ACCEPTED AS ALTERNATIVES TO THE AFORE � NEW 92 NEW <br /> OKIA AE LEAD ,^ W <br /> MENTIONED GROUND TESTS.TEST SHALL BE FROMNEWNOKIS AEQK W O W <br /> PERFORED WHILE THE COUNTERPOISE IS ISOLATED ANTENNA TO EXISTINGU. <br /> FROM THE AIC SYSTEM GRIDS AND EXISTING / SECTOR GROUND BAR(T 6-2 � N W <br /> COMMUNICATIONS FACILITY. / SEE DETAIL J ON SHEET G•2 O W <br /> ow <br /> CELL REFERENCE GROUND BAR:POINT OF GROUND <br /> REFERENCE FOR ALL COMMUNICATIONS EQUIPMENT 1 <br /> MECHANICAL LUG CONNECTION(TVP.) <br /> FRAMES.ALL BONDS ARE MADE WITH 82 STRANDED GREEN <br /> INSULATED COPPER CONDUCTORS.BOND TO GROUND SEE DETAIL 8 ON SHEET O.2 <br /> RING WITH(2)#2 SOLID TINNED COPPER CONDUITS � <br /> (ATT-TP-76416 7.6.7). <br /> HATCH PLATE GROUND BAR:BOND TO THE INTERIOR ISSUED FOR: <br /> GROUND RING WITH(2)S2 STRANDED GREEN INSULATED <br /> COPPER CONDUCTORS.WHEN A HATCH-PLATE AND ACELL REVIEW ��1 <br /> REFERENCE GROUND BAR ARE BOTH PRESENT,THE CELL <br /> SITE REFERENCE GROUND BAR MUST BE CONNECTED TO B3 PERMIT <br /> THE HATCH-PLATE AND TO THE INTERIOR GROUND RING BETA <br /> CONSTRUCTION <br /> USING(2)tl2 STRANDED GREEN INSULATED COPPER �* A3 RECORD <br /> A CONDUCTORS. ALPHA - <br /> EXTERIOR CABLE ENTRY PORT GROUND DARS:LOCATED 150' <br /> AT THE ENTRANCE TO TfiE CELL SITE BUILDING.BOND TO <br /> PROJECT MMNU9LR <br /> GROUND RING WITH A A2 SOLID TINNED COPPER <br /> CONDUCTORS WITH AN EXOTHERMIC WELD AND <br /> CB MAS <br /> INSPECTION SLEEVE(ATT-TP-76416 7.6.7.2t <br /> DURING ALL DC POWER SYSTEM CHANGES INCLUDING DC <br /> GPD JOB NO. <br /> SYSTEM CHANGE OUTS,RECTIFIER REPLACEMENTS OR <br /> ADDITIONS,BREAKER DISTRIBUTION CHANGES,BATTERY 2021723.0 .76 7. <br /> ADDITIONS,BATTERY REPLACEMENTS AND INSTALLATIONS <br /> OR CHANGES TO DC CONVERTER SYSTEMS IT SHALL BE <br /> REQUIRED THAT SERVICES CONTRACTORS VERIFY ALL DC ANTENNA GROUNDING DIAGRAM(105'-0"RAC) r <br /> POWER SYSTEMS ARE EQUIPPED WITH MASTER DC I� <br /> SYSTEM RETURN GROUND CONDUCTOR FROM THE DC 6 SCALE: NOT TO SCALE Z G=1 <br /> POWER SYSTEM COMMON RETURN BUS DIRECTLY <br /> CONNECTED TO THE CELL SITE REFERENCE GROUND BAR <br /> PER TP76300 SECTION H 6 AND TP764%FIGURE 7-11 <br /> REQUIREMENTS. <br />
The URL can be used to link to this page
Your browser does not support the video tag.