My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1020 39TH ST 2021 Plans 2026-01-06
>
Address Records
>
39TH ST
>
1020
>
Plans
>
1020 39TH ST 2021 Plans 2026-01-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2026 9:53:17 AM
Creation date
1/6/2026 9:52:51 AM
Metadata
Fields
Template:
Address Document
Street Name
39TH ST
Street Number
1020
Permit
BW2104-001
Year
2021
Notes
SFR reroof - REPAIR AND REFRAME OF ROOF
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE FOLLOWING NOTES APPLY EXCEPT WHERE SHOWN OTHERWISE <br /> CODE International Existing Building Code IEBC(2018) <br /> STRUCTURALLOADS <br /> FLOOR LIVE LOADS: Typical floor live load=40psf EE DESIGN <br /> ROOF SNOW LOADS: Roof snow load,Pr=25psf <br /> z z m <br /> FOUNDATIONS FIELD VERIFY SOLID °� o <br /> Maximum soil pressure 1500 pat(assumed). New exterior footings shall bear V-0"(minimum)below finish BLOCKING AT ROOF rc o <br /> grade.All footings to bear on firm undisturbed earth below organic,surface soils and shall be lowered if suitable BEARING WALL LINE ABOVE <br /> soil is not found at elevations shown on drawings. Backfill to be thoroughly compacted per Specifications. W c m <br /> Provide 2#5(minimum)continuous bottom of all walls and footings. < `� <br /> ANCHORAGE TO HARDENED CONCRETE <br /> Where expansion anchors are specified,use"Simpson Strong Bolt II"(reference ICC Report ER-3037.) <br /> I I I I I I I I I I 1 N <br /> Where epoxy anchors are specified,use"Simpson AT-XP"adhesive(reference ICC Report ER-263). Use ASTM <br /> 0 <br /> 1 1 1 1 1 1 1 1 1 <br /> A36 threaded rod,unless otherwise noted. Holes must be cleaned of dust and debris and be free of standing �11 -111� <br /> water when epoxy is installed. Special inspection of epoxy anchors is required. Do not cut any reinforcing bars UTILITY ROOM __ -—_—_— —_ —- ___ _______ m <br /> to install anchors. Defective holes shall be filled solid with epoxy. I I (E)s'kI G°(�LULAM 6EA�A <br /> 1 a <br /> For any substitutions to the above,the contractor shall submit to the Structural Engineer manufacturer's literature <br /> describing the anchors and listing ICC approved allowable shear and tension values. J� MAIN MOOR JOISTS b <br /> PLYWOOD/OSB I I ® O <br /> a <br /> Plywood/OSB roof,floor and wall sheathing to be APA rated C-D Exposure 1 per APA"Plywood Design I I ® I m h <br /> Specification"(Y510),unless noted otherwise. Maximum nail spacing shall be as follows: 6"o.c.at all supported <br /> panel edges, and 12"o.c. at intermediate supports. Nails shall be as follows: 8d common for 1/2"roof o I " I 0 •AL <br /> sheathing,10d common for 3/4'T&G floor sheathing,and 8d for 7/16"wall sheathing. Stagger end laps at roof "— -—-_—- —'—-—- <br /> and floor sheathing. All panel edges to be blocked at shear walls. Support shall be supplied to all plywood g I I (E)5'1 I G' ULAM BEA U <br /> edges with plyclips, blocking, tongue and groove plywood joints or other approved methods per APA �" I.�� UTILITY — <br /> recommendation. Plyclips are not allowed for floor sheathing. IT ROOM M.IN(FIL <br /> 11`9II <br /> TIMBER ? b N <br /> Structural timber and lumber to be stress grade Hem-Fir or Douglas fir as follows: <br /> In0 I I b i i a q <br /> USE SPECIES GRADE Fb `3 I I rn O CARPORT In Z <br /> 4 x beams Douglas Fir No.2 900 psi o f <br /> 6 x beams Douglas Fir No.2 1150 psi AP <br /> Exterior&bearing wall studs Hem-Fir No. 750 psi ® ----- — —' - ----'---- --' t�L <br /> Roof joists,floorjoists Hem-Fir No. 750 psi (E)s•xI G" ILULAM BEA�.n <br /> P ° I I CRAWL SPACE 1 (E7 2-3/4'-DIAM.STEEL OF(5 j O <br /> Interior studs at non-bearing walls Hem-Fir Standard 550 psi I I TOTAL of(s) <br /> All other lumber Hem-Fir Standard/Better --- x m I)zxa w I GI« V OJ <br /> 5 MNNLOOK Jo19r5 b tL <br /> Wood and wood based materials used in contact with soil,concrete or masonry,installed within V of concrete or o m <br /> masonry,or exposed to moisture either interior or exterior,shall be treated with an approved preservative per the o p I N <br /> "Preservative Treatment"section below. Solid blocking of not less than 2"nominal thickness shall be provided ____ _ __LI____ = TYp ' I p <br /> at ends and at all supports of joists and rafters. Between supports provide blocking or bridging at 8'-0"o.c. A <br /> 5-1 <br /> a _ <br /> All new sill plates to be 2x_preservative treated Hem-Fir#2,u.n.o.on the plans. Sill plates shall haves moisture F I� m ® _—_—_ _--_ --_—'___:_:__ --__:_: <br /> content of not greater than 19%before being covered with insulation,interior wall finish,floor covering or other N I I m re>s°x 1 G. LULAM BEA n� <br /> material. <br /> i0 o ILJ <br /> WOOD CONNECTORS ®� i i m w g bIN FLOOR�O�TS U <br /> Anchor bolts at foundaton sill plates shall be field verified.At existing concrete stem walls,use 5/8"diameter by <br /> 6"long Simpson"Titan-HD"screw anchors. Minimum spacing of bolts shall be 60"o.c.. - g ✓� to O <br /> Use galvanized 3"x 3"x 1/4"plate washers at all exterior wall sill bolts.Locate edge of washers 1/2"max from T W <br /> interior edge of wall sheathing Provide a minimum of two bolts each piece.Provide one bolt at end of each (n ~ <br /> piece,not less than 6"and not more than 12"from the end. N <br /> -_-_ -------- ------ <br /> Nails shall conform to requirements of ASTM F 1667 and have a minimum bending strength of 90 ksi for shank - — -- — ---'---"—" ------" m I— <br /> diameters between.142"and.177". All wood-to-wood nailing shall be per IRC Table R602.3(1),uno.Where plans or I I (E>s'k I G•GLULA EAM � o <br /> details specify 8d,10d or 16d nails,they shall have the following properties: I I 515TER DBL JOISTS AT lJJ o Of <br /> FIELD VERIFY SOLID NON-BRG PARTITION ABOVE: LU <br /> 8d=0.131"dia x 2-1/2" I I ® BLOCKING AT ROOF DBL 2xb (Pa NON-eEARING GL05ET WALL ABOVE Q <br /> 10d=0.148"dia x 3" - BEARING VqALL LINE ABOVE m <br /> 16d=0.162"dia x 3-1/2" <br /> ADD NEW BEAMS AT ROOF (E)ROOF BE4RIW9 <br /> All substitutions shall have the written approval of the engineer of record prior to use. BEARING WALL LINE ABOVE: WALL LINE ABOVE <br /> DBL 1-3/4'VT-1/4"1.qE-LVL <br /> Light gauge metal framing connectors and their required fasteners shall be"Strong-Tie'by Simpson Company, <br /> or approved equal. <br /> All fasteners and connectors in contact with preservative treated wood shall be hot-dipped galvanized steel with c 19-5' <br /> a G185 specification or type 304&316 stainless steel. Type 304 and 316 stainless steel should be used for all <br /> connectors and fasteners in contact with AZCA treated wood and some variations of ACQ treated woods. <br /> Hot-dipped galvanized steel should never come in contact with stainless steel. (B)FLOOR FRAMINGILJ <br /> 02/ U <br /> SCOPE OF STRUCTURAL ENGINEERING SERVICES NEN DBL-LVL FLOOR 515TERFO 2x5 <br /> 21 <br /> The Structural Engineer has performed the structural design and prepared the structural working drawings for BEAM PER PLAN FLR JOIST PtR PLAANN J <br /> this project. The construction must be performed in strict accordance with the structural drawings.Any deviation U <br /> from the drawings must be approved in writing by the Structural Engineer. Errors and/or omissions found on the <br /> structural drawings must be brought to the Structural Engineer's attention immediately.Omissions from the MAIN FLOOR F RAM I N G PLAN - STRUCTURAL UPGRADES <br /> drawings or specifications or the inadvertent mislabeling of details of work which are manifestly necessary to A FLOOR FRAMING SECTION q <br /> carry out the intent of the drawings and specifications,or which are customarily performed,shall not relieve the 1 14" — I'_0" SCALE: 3/4' I'-0" W <br /> Contractor from performing such omitted or inadvertent mislabeled details of the work but they shall be 6B W <br /> performed as if fully and correctly set forth and described in the drawings and specifications. ILJ <br /> LU <br /> Architectural drawings are the prime contract drawings. Structural drawings shall be used in conjunction with LLI J <br /> Architectural drawings. Primary structural elements are dimensioned on the Structural plans and details. The (N)yr Gwa (N)R-Is BATr Ne—TION O Q <br /> General Contractor shall verify and coordinate dimensions among all drawings.Any discrepancies, AT(e)exre_-- �I m g <br /> contradictions,or omissions shall be reported to the Architect for resolution prior to proceeding with work or 0 <br /> fabrication of the item(s)in question.Field measurements and the verification of field dimensions are not part of (q 2z4 SILL PL1Te TO REMAIN s 6 <br /> (E)2x4 WALL STUDS j Q 77 ^ ry N <br /> the Structural Engineer's responsibility. The Contractor must check all(assumed)existing conditions shown on (N)FINIsFED PLOORING V <br /> these drawings for accuracy and notify the Structural Engineer of any discrepancies. (n P"wr000 TO REMAN <br /> I <br /> The Structural Engineer is responsible for the design of the primary structural system, except for any (,y/yA\y//�\Wy/,�\y/,�\may// �1 <br /> components noted above. Responsibility for any secondary structural and non-structural systems not shown on (o rwoRJDIBrs �Mh� PROVIDE(N7 R-9D IN5UTATION <br /> BTW(E)FLOOR JOISTS <br /> the structural plans rests with someone other than the Structural Engineer.The structure shown on these DATE: <br /> drawings is structurally sound only in its completed form. The Contractor shall provide all necessary bracing to 1 <br /> stabilize the building during construction.The Structural Engineer is not responsible for,and will not have control (e1 FLOOR BEAMS .{ 3/12/2022 <br /> of,construction means,methods,techniques,sequences or procedures,or for safety precautions and programs <br /> in connection with the construction work,nor will he be responsible for the Contractor's failure to carry out the <br /> PROVIDe(N)5/B•_off-C"GWB �1 SHEET 51ZE: <br /> construction work in accordance with the contract documents. AT(n cuwoRr ce1uNG <br /> WRAP(E)BEPMS IN(NI B/B•TPE-x°GWB I <br /> GENERAL INSPECTIONS-WOOD FRAMING CONSTRUCTION CITY OF EVERETT �I 24"x 30 <br /> ELEMENT: Plywood roof and floor decking nailing REVIEWED FOR PERMIT �I <br /> PERIOD: Building Inspector shall inspect per IBC 110 and local AHJ requirements. (I DRAWING: <br /> ELEMENT: Bolts and lag screws n CARPORT CEILING UPGRADE DETAIL <br /> PERIOD: Building Inspector shall inspect per IBC 110 and local AHJ requirements. Qj I 3�4,I — I III S-1 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.