My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026/01/07 Council Agenda Packet
>
Council Agenda Packets
>
2026
>
2026/01/07 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2026 1:25:17 PM
Creation date
1/8/2026 1:20:56 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
1/7/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Project title: Award Construction Contract for 36th Street CSO Storage and Regulator Modifications, Phase 2 <br />project to Interwest Construction, Inc. <br />Council Bill # interoffice use <br /> <br />Project: 36th Street CSO Storage Improvements, UP3765 Phase 2 <br />Partner/Supplier: NA <br /> Location: 3600 Smith Avenue <br />Preceding action: Ordinance 4074-25 passed 2/12/25; permission to advertise authorized 7/9/25 <br />Fund: 336 – Water and Sewer System Improvements, Program 022 <br />Agenda dates requested: <br /> <br /> <br />Briefing <br />Proposed action <br />Consent 1/07/26 <br />Action <br />Ordinance <br />Public hearing <br /> Yes X No <br /> <br />Budget amendment: <br /> Yes X No <br /> <br />PowerPoint presentation: <br /> Yes X No <br /> <br />Attachments: <br />Bid Summary, Project Map <br /> <br />Department(s) involved: <br />Public Works <br /> <br />Contact person: <br />Tom Hood <br /> <br />Phone number: <br />425-257-8809 <br /> <br />Email: <br />THood@everettwa.gov <br />Initialed by: <br /> RLS <br />Department head <br /> <br />Administration <br /> <br />Council President <br />Fiscal summary statement: <br />This project is included in the current Public Works Capital Improvements Program for Sewer <br />Infrastructure. The funding source for this project will be Fund 336 Water and Sewer System <br />Improvements, Program 022. The programmed available funding established by City Ordinance <br />No. 4074-25 is $42,500,000. <br />The estimated cost for Phase 2 is $35M. <br /> <br />Project summary statement: <br />Bid proposals for the 36th Street CSO Storage Improvements were opened on December 9, 2025. <br />Eight (8) proposals were received. Interwest Construction, Inc. of Burlington, WA was the lowest <br />responsive and responsible bidder with a proposal of $20,955,622.10. The Engineer’s estimate <br />was $30,880,000.00. City staff recommends awarding the construction contract to Interwest <br />Construction, Inc. <br />This is Phase 2 of 2 for this project and will build a combined sewer overflow storage tank at 3600 <br />Smit Ave, which is City-owned property south of the Everett Station Park and Ride Lot B. This <br />project is anticipated to help bring the City into compliance with its NPDES permit for the SRO7 <br />and SRO8 combined sewer outfalls and Agreed Order No. 11638 issued in 2015 by the <br />Department of Ecology to reduce combined sewer overflow events. <br /> <br />Recommendation (exact action requested of Council): <br />Award the Construction Contract for the 36th Street CSO Storage Improvements project, UP 3765 <br />Phase 2, to Interwest Construction, Inc. of Burlington, WA, in the amount of $20,955,622.10. <br /> <br />City Council Agenda Item Cover Sheet
The URL can be used to link to this page
Your browser does not support the video tag.