My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction, Inc. 1/13/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Interwest Construction, Inc. 1/13/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2026 9:28:40 AM
Creation date
1/13/2026 8:48:36 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction, Inc.
Approval Date
1/13/2026
Council Approval Date
1/7/2026
Department
Public Works
Department Project Manager
Candice Au-Yeung
Subject / Project Title
36th ST CSO Storage Improvements
Tracking Number
0005068
Total Compensation
$20,955,622.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1625
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 73 43 - 1 00 73 43 - 1 WAGE RATE REQUIREMENTS SECTION 00 73 43 - WAGE RATE REQUIREMENTS 1.1 SPECIFICATION REFERENCE A. Section 00 72 00 – GENERAL CONDITIONS, Part 7.1 “Wages of Employees”. 1.2 WORK LOCATION A. All Work performed within Snohomish County, WA. 1.3 PREVAILING WAGE REQUIREMENTS A. Contractor agrees to comply with all state and federal laws relating to the employment of labor and wage rates to be paid. The hourly wages to be paid to laborers, workers, or mechanics shall be not less than the prevailing rate of wage for an hour’s work in the same trade or occupation in Snohomish County. 1. Washington State Prevailing Wage Rates for Snohomish County, effective 8/31/2025; Benefit Code Key, effective 8/31/2025 are, by reference, made a part of this Contract. 2. Prevailing wage rates can be accessed at the following URL: https://www.lni.wa.gov/licensing-permits/public-works-projects/prevailing-wage-rates 3. Printed copies of the current prevailing wage forms are available upon request. B. In the preparation of its Bid, based on these Specifications, the Bidder is solely responsible to 1. Use the schedule in effect at the time of the Bid Opening Date and time, 2. Determine the appropriate labor classification(s); and 3. Utilize the appropriate and correct prevailing wage and benefit rate(s). C. No payment will be made on this Contract until the Contractor and each Subcontractor has submitted a “Statement of Intent to Pay Prevailing Wages”, form F700-029-000, which has been approved by the industrial statistician of the Department of Labor and Industries. D. No final payment or release of retainage will be made until the Contractor and each Subcontractor has submitted an “Affidavit of Wages Paid”, form F700-007-000, which has been certified by the industrial statistician of the Department of Labor and Industries.
The URL can be used to link to this page
Your browser does not support the video tag.