My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction, Inc. 1/13/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Interwest Construction, Inc. 1/13/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2026 9:28:40 AM
Creation date
1/13/2026 8:48:36 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction, Inc.
Approval Date
1/13/2026
Council Approval Date
1/7/2026
Department
Public Works
Department Project Manager
Candice Au-Yeung
Subject / Project Title
36th ST CSO Storage Improvements
Tracking Number
0005068
Total Compensation
$20,955,622.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1625
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT <br />36TH ST CSO STORAGE IMPROVEMENTS WO 3765-2 <br /> <br /> <br /> <br />PW\JA\W3Y02300 SUMMARY OF WORK <br />SEPTEMBER 2025 01 11 00 - 1 <br />©COPYRIGHT 2025 JACOBS <br />SECTION 01 11 00 <br />SUMMARY OF WORK <br />PART 1 GENERAL <br />1.01 WORK COVERED BY CONTRACT DOCUMENTS <br />A. The completed Work will provide the Owner with a 1.8 MG CSO Storage <br />Facility which includes a duplex tank Drain Pump Station and valve vault, <br />tipping buckets, C2 system and 1-1/2 inches to 2-inch piping, level sensing <br />equipment, slide gates, interior baffles, 36th Street Regulator improvements, <br />a Tank Discharge structure, sewer piping to and from the tank, site fencing, <br />gravel access road, and a 48-inch CSO extension to 36th Street and Smith <br />Avenue. <br />1.02 WORK NOT COVERED BY CONTRACT DOCUMENTS <br />A. Relocation of telecom and gas facilities which will be completed in advance <br />of construction. <br />B. Continuation of 48-inch CS extension west of 36th Street and Smith Avenue. <br />1.03 PROVISIONS FOR FUTURE WORK <br />A. Provisions for future construction are as shown. <br />PART 2 PRODUCTS (NOT USED) <br />PART 3 EXECUTION (NOT USED) <br />END OF SECTION
The URL can be used to link to this page
Your browser does not support the video tag.