Laserfiche WebLink
CITY OF EVERETT <br />36TH ST CSO STORAGE IMPROVEMENTS WO 3765-2 <br /> <br /> <br /> <br />PW\JA\W3Y02300 SUMMARY OF WORK <br />SEPTEMBER 2025 01 11 00 - 1 <br />©COPYRIGHT 2025 JACOBS <br />SECTION 01 11 00 <br />SUMMARY OF WORK <br />PART 1 GENERAL <br />1.01 WORK COVERED BY CONTRACT DOCUMENTS <br />A. The completed Work will provide the Owner with a 1.8 MG CSO Storage <br />Facility which includes a duplex tank Drain Pump Station and valve vault, <br />tipping buckets, C2 system and 1-1/2 inches to 2-inch piping, level sensing <br />equipment, slide gates, interior baffles, 36th Street Regulator improvements, <br />a Tank Discharge structure, sewer piping to and from the tank, site fencing, <br />gravel access road, and a 48-inch CSO extension to 36th Street and Smith <br />Avenue. <br />1.02 WORK NOT COVERED BY CONTRACT DOCUMENTS <br />A. Relocation of telecom and gas facilities which will be completed in advance <br />of construction. <br />B. Continuation of 48-inch CS extension west of 36th Street and Smith Avenue. <br />1.03 PROVISIONS FOR FUTURE WORK <br />A. Provisions for future construction are as shown. <br />PART 2 PRODUCTS (NOT USED) <br />PART 3 EXECUTION (NOT USED) <br />END OF SECTION