My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction, Inc. 1/13/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Interwest Construction, Inc. 1/13/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2026 9:28:40 AM
Creation date
1/13/2026 8:48:36 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction, Inc.
Approval Date
1/13/2026
Council Approval Date
1/7/2026
Department
Public Works
Department Project Manager
Candice Au-Yeung
Subject / Project Title
36th ST CSO Storage Improvements
Tracking Number
0005068
Total Compensation
$20,955,622.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1625
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT 36TH ST CSO STORAGE IMPROVEMENTS WO 3765-2 Pages TABLE OF CONTENTS PW\JA\W3Y02300 00 01 10 - vi SEPTEMBER 2025 ©COPYRIGHT 2025 JACOBS 40 90 00 Instrumentation and Control for Process Systems ................... 1- 42 Supplements: Loop Specifications ................................................................. 1- 9 Equipment/Instrument List ...................................................... 1- 2 PLC Input/Output List ............................................................. 1- 5 Control Panel Schedule ............................................................ 1- 1 Loop Status Report .................................................................. 1- 1 Instrument Calibration Sheet ................................................... 1- 1 I&C Valve Adjustment Sheet .................................................. 1- 1 Performance Test Sheet ........................................................... 1- 1 40 91 00 Instrumentation and Control Components ............................... 1- 18 40 99 90 Package Control Systems ......................................................... 1- 17 DIVISIONS 41—42 (NOT USED) DIVISION 43—PROCESS GAS AND LIQUID HANDLING, PURIFICATION, AND STORAGE EQUIPMENT 43 23 16 Pumping Equipment—Packaged C2 Pump System ................ 1- 19 DIVISION 44—POLLUTION AND WASTE CONTROL EQUIPMENT 44 42 28 Weir and Baffle Plates ............................................................. 1- 3 44 42 56.04 CSO Submersible Drain Pumps ............................................... 1- 7 Supplement: Drain Pump 1, Drain Pump 2 ................................................... 1- 2 DIVISION 45—(NOT USED) DIVISION 46—WATER AND WASTEWATER EQUIPMENT 46 46 13 Tipping Buckets ............................................................................. 1- 8 DIVISIONS 47—49 (NOT USED) APPENDICES • APPENDIX A – GEOTECHNICAL DATA REPORT • APPENDIX B – CITY OF EVERETT STANDARD DETAILS • APPENDIX C – CONSTRUCTION STORMWATER GENERAL PERMIT • APPENDIX D – PREVAILING WAGES DRAWINGS (BOUND SEPARATELY) END OF SECTION
The URL can be used to link to this page
Your browser does not support the video tag.