My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction, Inc. 1/13/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Interwest Construction, Inc. 1/13/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2026 9:28:40 AM
Creation date
1/13/2026 8:48:36 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction, Inc.
Approval Date
1/13/2026
Council Approval Date
1/7/2026
Department
Public Works
Department Project Manager
Candice Au-Yeung
Subject / Project Title
36th ST CSO Storage Improvements
Tracking Number
0005068
Total Compensation
$20,955,622.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1625
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT 36TH ST CSO STORAGE IMPROVEMENTS WO 3765-2 PAYMENT PROCEDURES PW\JA\W3Y02300 01 29 00 - 2 SEPTEMBER 2025 ©COPYRIGHT 2025 JACOBS H. Where measurement of quantities depends on elevation of existing ground, elevations obtained during construction will be compared with those shown on Drawings. Variations of 1 foot or less will be ignored, and profiles shown on Drawings will be used for determining quantities. I. Units of measure shown on Bid Form shall be as follows, unless specified otherwise. Item Method of Measurement AC Acre—Field Measure by Engineer CY Cubic Yard—Field Measure by Engineer within limits specified or shown CY-VM Cubic Yard—Measured in Vehicle by Volume EA Each—Field Count by Engineer GAL Gallon—Field Measure by Engineer HR Hour LB Pound(s)—Weight Measure by Scale LF Linear Foot—Field Measure by Engineer MFBM Thousand Foot Board Measure—[Delivery Invoice] [Field Measure by Engineer] SF Square Foot SY Square Yard TON Ton—Weight Measure by Scale (2,000 pounds) 1.02 PAYMENT A. Payment for all Lump Sum Work shown or specified in Contract Documents is included in the Contract Price. Payment will be based on a percentage complete basis for each line item of the accepted Schedule of Values. B. Bidding Schedule is divided into bid items whose definitions follows: 1. Payment for Lump Sum Work, covers all Work specified or shown within the limits or Specification. 2. Payment for Unit Price Items, covers all the labor, materials, and services necessary to furnish and install the items.
The URL can be used to link to this page
Your browser does not support the video tag.