My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction, Inc. 1/13/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Interwest Construction, Inc. 1/13/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2026 9:28:40 AM
Creation date
1/13/2026 8:48:36 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction, Inc.
Approval Date
1/13/2026
Council Approval Date
1/7/2026
Department
Public Works
Department Project Manager
Candice Au-Yeung
Subject / Project Title
36th ST CSO Storage Improvements
Tracking Number
0005068
Total Compensation
$20,955,622.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1625
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT 36TH ST CSO STORAGE IMPROVEMENTS WO 3765-2 PAYMENT PROCEDURES PW\JA\W3Y02300 01 29 00 - 4 SEPTEMBER 2025 ©COPYRIGHT 2025 JACOBS Item Description Bid Item 2, Trench Excavation Safety Systems – Lump Sum. As required by RCW 39.04.180, this bid item shall include all cost for work of providing adequate safety systems for trench excavation which exceed a depth of 4 feet to comply with the requirements of the Washington Industrial Safety and Health Act, Chapter 49.17 RCW. The costs of trench safety systems shall not be considered as incidental to any other contract item and any attempt to include the trench safety systems as an incidental cost is prohibited. Measurement will be in accordance with a reasonable apportionment of the work as established in the Schedule of Values. Payment will be based upon the percentage of completion for each appropriate line item in the Schedule of Values. Bid Item 3, Packaged C2 Water System – Lump Sum. This bid item shall include all cost for work of providing and commissioning the “Package C2 Water System” as shown on M501 and specified in Section 43 23 16, Pumping Equipment—Packaged C2 Pump System. Measurement will be per Lump Sum.
The URL can be used to link to this page
Your browser does not support the video tag.