Laserfiche WebLink
City of Everett 00 21 13 - 14 00 21 13 - 14 INSTRUCTIONS TO BIDDERS 4. RCW 35.22.650 Certification: To be filled in and signed by the Bidder. 5. Non-Collusion Affidavit: To be signed, notarized and submitted with the Bid. Failure to complete and fully execute the aforementioned forms and to submit them with the Bid may result in rejection of Bid. However, as stated in the Subcontractor Identification Form, a portion of that form may be submitted after the Bid. Forms for Submission after Award of Contract The following forms are to be executed after the award of Contract: 1. Contract: This Contract to be executed by the successful Bidder with the City’s AdobeSign system within 3 business days after receipt from the City’s AdobeSign System. 2. Payment and Performance Bonds: These forms are to be executed by the successful Bidder and the Bidder’s surety company. The amount of these bonds shall be 100 percent of the Total Bid and shall be submitted within 14 days after the Notice of Award. 3. Proof of Insurance: Insurance certificates and endorsements shall be obtained and maintained in force in accordance with SECTION 00 72 00, Part 15 “Liability and Insurance”, of the Contract Documents. These shall be submitted within 14 days after the Notice of Award. 4. Power of Attorney: Attorneys-in-fact who sign bid bonds or contract bonds must file with each bond a certified and effectively dated copy of their Power of Attorney. 5. Statement of Intent to Pay Prevailing Wage (L&I Form F700-029-000) and Affidavit of Wages Paid (F700-007-000) from the Contractor, Subcontractor and agents to the Subcontractor shall be submitted to the Employment Standards Division, State Department of Labor and Industries, Olympia, Washington. If the prime contract is over $1,000,000, then Contractor also needs to submit L&I Form F700-164-000 (Affidavit of Wages Paid EHB 2805 Addendum). 6. Weekly Statement with Respect to Payment of Wages (U.S. Dept of Labor Form WH347): Contractors, Subcontractors, and agents to Subcontractors using Payroll Form WH347 may use State of Compliance found on the back of the form. 7. Weekly Statement of Compliance (U.S. Dept of Labor Form WH348). Contractors, Subcontractors, or agents to Subcontractors not using Payroll Form WH347 shall attach the Statement of Compliance Form WH348 to each payroll. 8. Approval of Subcontractors: Contractors shall request approval of Subcontractors on a form provided by the City prior to their working on the Site. 9. Construction Progress Schedule: To be submitted as required by Section 00 72 00, Part 5 “Progress and Completion”, of the Contract Documents by the Contractor within ten calendar days, or such time as determined by the City, after the date of receipt of Notice to Proceed. 10. Traffic Control Plan: Standard Traffic Control Plans are included in the City’s Design and Construction Standards. If, and to the extent, such plans are not sufficient, complete or adequate to support the Bidder’s planned means and methods of performing the Work, the Bidder must develop an adequate, complete and sufficient traffic control plan at its cost, that shall be submitted for the City’s approval prior to construction. Deviation from the Standard Plans must be submitted by the Contractor and approved by the City prior to construction. 11. Disposal Sites: Provide the City with the location of all disposal sites to be used, and also provide copies of the permits and approvals for such disposal sites. The