Interwest Construction, Inc. 1/13/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Interwest Construction, Inc. 1/13/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2026 9:28:40 AM
Creation date
1/13/2026 8:48:36 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction, Inc.
Approval Date
1/13/2026
Council Approval Date
1/7/2026
Department
Public Works
Department Project Manager
Candice Au-Yeung
Subject / Project Title
36th ST CSO Storage Improvements
Tracking Number
0005068
Total Compensation
$20,955,622.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1625
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 41 13 - 3 00 41 13 - 3 BID FORM D. In the event our Bid is not accepted within the time stated above, the required Bid security will be returned to the undersigned, according to the provisions of the Instructions to Bidders, unless a mutually satisfactory arrangement is made for its retention and validity for an extended period of time. E. If this Project contains apprentice utilization requirements, then Bidder certifies: For each public project completed by Bidder during the two-year period immediately preceding the date of this Bid solicitation, no awarding agency has made a final determination that the Bidder failed, without good faith efforts approved by the awarding agency, to meet applicable project apprentice utilization requirements. 1.4 CONTRACT TIME A. If this Bid is accepted, we will: 1. Begin work immediately after receiving Owner’s letter of Notice to Proceed and to reach Substantial Completion within the dates required under the Contract Documents. 2. Agree to pay liquidated damages to the City as stated in the Contract in the event the project is not completed on or before required time periods. 3. Contract with the Owner using the Contract form provided herewith, on the terms and conditions contained herein, to do everything necessary to complete the construction of the project in the allotted time. 1.5 ADDENDA A. Following Addenda have been received, and the modifications to the Bid Documents noted below have been considered and all costs are included in the Bid. Addendum No…………….., dated …………….. Addendum No…………….., dated …………….. Addendum No…………….., dated …………….. Addendum No…………….., dated …………….. 1.6 BIDDER CERTIFICATIONS A. Bidder, at the time of submitting this Bid and throughout the period of the contract, will remain licensed by the state of Washington to perform the type of work required under the Contract Documents. B. Bidder is skilled and regularly engaged in the general class and type of work required by the Contract Documents and has the capability to successfully manage construction projects.