Laserfiche WebLink
PUBLIC WORKS <br />PERMIT <br />PUBLIC WORKS DEPARTMENT <br />3200 Cedar Street <br />Everett, WA 98201'` <br />(425) 257-8810'? <br />r Date 7 F ; ? g.0 7 <br />Public Works Permit# P00707--003 <br />Building Permit # <br />Planning Reference # <br />Public Works Fee $ $50 b f)0 <br />Guarantee$ <br />OWNER NAME APPLICANT NAME <br />AND ADDRESS: Adair Enterprise. LLC. AND ADDRESS: Adair Enterprises LLC. <br />1-7032 35th Ave, S.E. 17032 35th Ave. S.E. <br />;EATTILE ETA 98102 Bothell fffa 9810 <br />PHONE: �f+ 7�96 �5 PHONE: 206799622`-% <br />TAX PARCEL I.D.# PROJECTADDRESS: <br />7t11fl 15.ccv�rlt* R1 crri <br />DESCRIPTION OF <br />PROPOSED WORK: Short Plat 1202-09-07 <br />-water meter service <br />7012 Beverly Blvd <br />PERMIT CONDITIONS <br />and sewer for L•ot. #2 <br />1. All calls for inspection shall be made 24 hours in advance. <br />2. All work shall be performed in accordance with this permit and current City of Everett Design and Construction <br />Standards and Specifications. <br />3. Call Location Underground Service 48 hrs. before you dig. TOLL FREE NUMBER 1-800-424-5555 <br />4. Construct per plan. <br />G <br />-.7 <br />U <br />0 `= <br />P G3 c'7 .•.•. <br />r <br />ACKNOWLEDGEMENT OF CONDITIONS <br />The undersigned owner/applicant hereby agrees to hold and <br />lz5z;�� � - <br />save harmless the City of Everett from any and all <br />claims for <br />Approved for Construction Date damages, costs, expenses, or causes of action that may arise <br />because of installation and maintenance of the improvement or <br />other right-of-way use hereto applied for and further agrees to <br />�� remove same upon notice from the City and to replace public <br />SPECTION property damaged thereby. <br />Approved as Constructed Date <br />Signature of Applicant . Date <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED <br />TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />EPWP (7/06) DATABAR, INC. <br />