My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5410 BROADWAY 2026-02-04
>
Address Records
>
BROADWAY
>
5410
>
5410 BROADWAY 2026-02-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2026 3:43:52 PM
Creation date
1/14/2026 10:31:36 AM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
5410
Notes
DAVE RUCKER 2320 GALE PL
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT <br />City of Everett Public Works Department <br />3200 Cedar Street <br />Everett, WA 98201 <br />(425) 257-8810 <br />Date: 5/3/2012 <br />Public Works Permit #: PW1205-004 <br />Building Permit #; C1203-007 <br />Planning Reference #: <br />Public Works Fee $: $ 25.00 <br />Other $: <br />OWNER NAME AND ADDRESS: <br />APPLICANT NAME AND ADDRESS: <br />J JONES INVESTMENTS LLC <br />SAME <br />2216 204TH ST NW <br />STANWOOD WA 98292 <br />PHONE: 4253089646 <br />PHONE: <br />TAX PARCEL ID # 0050060003203 <br />SITE ADDRESS: 5410 BROADWAY <br />DESCRIPTION OF PROPOSED WORK: <br />NEW SFR <br />Lot 2-Shortplat 1202-10-007 <br />PERMIT CONDITIONS <br />1. All calls for inspection shall be made 24 hours in advance. <br />2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br />and Specifications. <br />3. Call Location Underground Service 48, hrs before you dig. TOLL FREE NUMBER 811 <br />4. Connect side sewer per City Standard #'s 601, 602, 604. <br />5. Connect rooftop downspouts to the drainage system provided for this lot. <br />6. The contractor must meet with the Public Works Inspector to discuss potential drainage routing prior to <br />beginning the project. Call Randy Allen at 425-339-7403 <br />7. Install erosion control measures as determined by the Public Works inspector, such as silt fence, straw bales, <br />swales, or erosion blankets. <br />8. Remove erosion control measures upon completion of the project prior to final approval of the permit. <br />9. All excavated material from foundation, sidewalk and driveways shall be hauled to an approved, permitted site. <br />No wasting of material is allowed on this building lot. <br />10. No dirt, mud, rocks or debris to be tracked onto roadway. <br />11. Pave driveway from the front property line out to the street paving. <br />w <br />C <br />h <br />C) <br />ACKNOWLEDGEMENT OF CONDITIONS <br />The undersigned owner/applicant hereby agrees to hold and <br />save harmless the City of Everett from any and all claims for <br />damages, costs, expenses, or causes of action that may arise <br />because of installation and maintenance of the improvement <br />S or other right-of-way use hereto applied for and further agrees <br />to remove same upon notice from the City and to replace <br />Appr ed for Const ion ate bli Vperty damaged thereby. <br />i <br />FINAL INSPECTION Date <br />Approved as Constructed XQ <br />Sig- ture of Applicant Date <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE P MIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br />PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.