My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Earthwork Solutions, LLC 1/14/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Earthwork Solutions, LLC 1/14/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2026 2:09:51 PM
Creation date
1/14/2026 2:01:24 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthwork Solutions, LLC
Approval Date
1/14/2026
Council Approval Date
1/7/2026
Department
Public Works
Department Project Manager
Laura Claywell
Subject / Project Title
RRFB PEDESTRIAN SAFETY
Tracking Number
0005072
Total Compensation
$715,108.86
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
RRFB PEDESTRIAN SAFETY October 31, 2025 <br />STATE FUND # HLP-PB25(004) <br />WO 3807 <br />Page 1 of 3 <br /> <br />Note: Unit prices for all items, all extensions, and the total amount bid must be shown. Where conflict occurs between the <br />unit price and the total amount named for any item, the unit price shall prevail, and totals shall be corrected to conform <br />thereto. All entries must be typed or entered in ink. <br /> <br />BID SCHEDULE RRFB PEDESTRIAN SAFETY WO# 3807 <br /> BIDDER:___________________________ <br />Item <br />No. ITEM DESCRIPTION Unit Bid <br />Qty UNIT PRICE TOTAL AMOUNT <br />1 MOBILIZATION (3-LOCATIONS) LS 1 $_______.___ $______________.___ <br />2 REMOVE PLASTIC LINE LF 78 $_______.___ $______________.___ <br />3 REMOVE PLASTIC STOP LINE SF 45 $_______.___ $______________.___ <br />4 REMOVING PLASTIC CROSSWALK LINE SF 170 $_______.___ $ ________________ <br />5 ROADWAY EXCAVATION INCL. HAUL CY 20 $_______.___ $______________.___ <br />6 CRUSHED SURFACING BASE COURSE TON 11 $_______.___ $______________.___ <br />7 SAWCUT LF 339 $_______.___ $______________.___ <br />8 HMA Cl. 1/2" PG 64-22 (for Pavement Patch) TON 16 $_______.___ $______________.___ <br />9 SPCC PLAN / TESC LS 1 $_______.___ $______________.___ <br />10 INLET PROTECTION EACH 4 $ ______.___ $______________.__ <br />11 TOPSILE TYPE B SY 175 $_______.___ $______________.___ <br />12 SOD INSTALLATION SY 175 $_______.___ $______________.___ <br />13 STREET CLEANING HR 24 $_________.__ $______________.__ <br />14 FLAGGERS (MINIMUN BID PREVAILING WAGE) HR 256 $________.___ $______________.__ <br />15 TRAFFIC CONTROL SUPERVISOR HR 70 $_______.___ $______________.___ <br />16 UNIFORMED POLICE OFFICER HR 16 $_______.___ $______________.___ <br />17 PROJECT TEMPORARY TRAFFIC CONTROL LS 1 $____12,000.00 $________12,000.00_ <br /> <br />18 <br /> <br />WORK ZONE SAFETY CONTINGENCY <br /> <br />FA <br /> <br />1 <br /> <br />$___5000.00_ <br /> <br />$_____5,000.00 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.