My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Earthwork Solutions, LLC 1/14/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Earthwork Solutions, LLC 1/14/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2026 2:09:51 PM
Creation date
1/14/2026 2:01:24 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthwork Solutions, LLC
Approval Date
1/14/2026
Council Approval Date
1/7/2026
Department
Public Works
Department Project Manager
Laura Claywell
Subject / Project Title
RRFB PEDESTRIAN SAFETY
Tracking Number
0005072
Total Compensation
$715,108.86
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
RRFB PEDESTRIAN SAFETY October 31, 2025 <br />STATE FUND # HLP-PB25(004) <br />WO 3807 <br />Page 2 of 3 <br /> <br /> <br />Item <br />No. ITEM DESCRIPTION Unit Bid <br />Qty UNIT PRICE TOTAL AMOUNT <br />19 PRECAST CONC. CURB-12" LF 236 $_______.___ $______________.___ <br />20 CEMENT CONCRETE CURB TYPE E-1 LF 31 $_______.___ $______________.___ <br />21 CEMENT CONC CURB TYPE A-1 LF 31 $_______.___ $______________.___ <br />22 CURB RAMP, TYPE C EACH 1 $_______.___ $______________.___ <br />23 CURBE RAMP, PERPENDICULAR TYPE B EACH 1 $_________._ $____________.____ <br />24 BIKE CURB RAMP EACH 1 $_______.___ $______________.___ <br />25 <br />TRAFFIC SIGNAL SYSTEM -RRFB (Sievers Duecy & <br />10th) LS 2 $_______.___ $______________.___ <br />26 <br />TRAFFIC SIGNAL SYSTEM PEDESTRIAN HALF SIGNAL <br />(SUMMIT) LS 1 $_______.___ $______________.___ <br />27 <br />DIRECTIONAL BORING/CONDUIT INSTALLATION - <br />RRFB LF 123 $_______.___ $______________.___ <br />28 <br />DIRECTIONAL BORING/CONDUIT INSTALLATION - <br />Half Signal LF 79 $_________._ $______________.__ <br />29 24" PLASTIC CROSSWALK LINE SF 460 $_________._ $______________.___ <br />30 24" PLASTIC CROSSWALK LINE GREEN SF 84 $_________._ $______________.___ <br />31 24" PLASTIC STOP LINE LF 65 $_________._ $______________.___ <br />32 PLASTIC LINE 4" LF 385 $_________._ $______________.___ <br />33 PLASTIC LINE 8" LF 111 $_________._ $______________.___ <br />34 TYPE 2 RPM HUND 0.21 $_________._ $______________.___ <br />35 FLEXIBLE GUIDE POST(SURFACE MOUNT TRUBULAR) EACH 18 $_________._ $______________.___ <br />36 PERMANENT SIGNING LS 1 $_________._ $______________.___ <br />37 DETECTABLE WARNING SURFACE (MEDIAN RRFB) SF 104 $_________._ $______________.___ <br />38 <br />DETECTABLE DIRECTIONAL STRIP (BIKE RAMP AT <br />SUMMIT) SF 16 $_________._ $______________.___ <br />39 CEMENT CONC. SIDEWALK SY 136 $_________._ $______________.___ <br />40 ADA FEATURE SURVEYING LS 1 $_________._ $______________.___ <br />41 RECORD DRAWINGS (MINIMUN BID) LS 1 $____1,500.00 $__________1,500.00
The URL can be used to link to this page
Your browser does not support the video tag.