My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Earthwork Solutions, LLC 1/14/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Earthwork Solutions, LLC 1/14/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2026 2:09:51 PM
Creation date
1/14/2026 2:01:24 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthwork Solutions, LLC
Approval Date
1/14/2026
Council Approval Date
1/7/2026
Department
Public Works
Department Project Manager
Laura Claywell
Subject / Project Title
RRFB PEDESTRIAN SAFETY
Tracking Number
0005072
Total Compensation
$715,108.86
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br /> <br /> <br /> Prefabr icated items specifically produced for public works projects that are prefabricated in a <br />county other than the county wherein the public works project is to be completed, the wage for <br />the off site prefabrication shall be the applicable prevailing wage for the county in which the actual <br />prefab rication takes place. <br /> It is the manufacturer of the prefabricated product to verify that the correct county wage rates are <br />applied t o work they perform. <br /> See RCW 39.12.010 <br /> (The definition of "locality" in RCW 39.12.010(2) contains the phrase "wherein the physical work is being performed." The department <br />interpret s this phrase to mean the actual work site. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> ITEM DESCRIPTION YES NO <br /> <br />53. Fencing materials <br /> X X <br />54. Guide Posts <br /> X X <br />55. Traffic Buttons <br /> X X <br />56. Epoxy <br /> X X <br />57. Cribbing <br /> X X <br />58. Water distribution materials <br /> X X <br />59. Steel "H" piles X X <br />60. Steel pipe for concrete pile casings X X <br />61. Steel pile tips, standard <br /> X X <br />62. Steel pile tips, custom X X <br /> <br />Supplemental to Wage Rates 8 <br />3/5/2025 Edition, Published February 11, 2024
The URL can be used to link to this page
Your browser does not support the video tag.