My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Earthwork Solutions, LLC 1/14/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Earthwork Solutions, LLC 1/14/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2026 2:09:51 PM
Creation date
1/14/2026 2:01:24 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthwork Solutions, LLC
Approval Date
1/14/2026
Council Approval Date
1/7/2026
Department
Public Works
Department Project Manager
Laura Claywell
Subject / Project Title
RRFB PEDESTRIAN SAFETY
Tracking Number
0005072
Total Compensation
$715,108.86
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
PAGE <br /> <br />RRFB PEDESTRIAN SAFETY October 31, 2025 <br />STATE FUND # HLP-PB25(004) <br />WO 3807 <br /> C <br /> Subcontractor Approval -------------------------------------------------------------------------- 40 1 <br /> Clauses Required in Subcontracts of All Tiers---------------------------------------------- 40 2 <br /> Progress Schedule -------------------------------------------------------------------------------- 40 3 <br /> General Requirements --------------------------------------------------------------------------- 40 4 <br /> Type A Progress Schedule ---------------------------------------------------------------------- 40 5 <br /> Prosecution Of Work ----------------------------------------------------------------------------- 41 6 <br /> Time For Completion ----------------------------------------------------------------------------- 41 7 <br /> Suspension of Work ------------------------------------------------------------------------------ 42 8 <br /> Liquidated Damages ------------------------------------------------------------------------------ 43 9 <br />MEASUREMENT AND PAYMENT --------------------------------------------------------------- 43 10 <br /> Force Account -------------------------------------------------------------------------------------- 43 11 <br /> Payments-------------------------------------------------------------------------------------------- 44 12 <br /> Retainage ------------------------------------------------------------------------------------------- 45 13 <br />TEMPORARY TRAFFIC CONTROL ------------------------------------------------------------ 46 14 <br /> Traffic Control Management -------------------------------------------------------------------- 46 15 <br /> General ---------------------------------------------------------------------------------------------- 46 16 <br /> Measurement --------------------------------------------------------------------------------------- 47 17 <br /> Reinstating Unit Items With Lump Sum Traffic Control ----------------------------------- 47 18 <br />DIVISION 2 19 <br />EARTHWORK 20 <br />CLEARING, GRUBBING, AND ROADSIDE CLEANUP ------------------------------------ 48 21 <br /> Payment --------------------------------------------------------------------------------------------- 48 22 <br /> Removal of Pavement, Sidewalks, Curbs, and Gutters ---------------------------------- 48 23 <br />2-02.5 Payment -------------------------------------------------------------------------------------- 48 24 <br />2-03.4 Measurement -------------------------------------------------------------------------------- 49 25 <br />DIVISION 4 26 <br />BASES 27 <br />4-04.1 Description ----------------------------------------------------------------------------------- 50 28 <br />DIVISION 5 29 <br />SURFACE TREATMENTS AND PAVEMENTS 30 <br />5-04.3 Construction Requirements -------------------------------------------------------------- 51 31 <br />A Mix Design ------------------------------------------------------------------------------------------ 51 32 <br />5-04.3(8)A ACCEPTANCE SAMPLING AND TESTING – HMA MIXTURE ----------- 52 33 <br />5-04.5 Payment -------------------------------------------------------------------------------------- 52 34
The URL can be used to link to this page
Your browser does not support the video tag.