My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Earthwork Solutions, LLC 1/14/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Earthwork Solutions, LLC 1/14/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2026 2:09:51 PM
Creation date
1/14/2026 2:01:24 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthwork Solutions, LLC
Approval Date
1/14/2026
Council Approval Date
1/7/2026
Department
Public Works
Department Project Manager
Laura Claywell
Subject / Project Title
RRFB PEDESTRIAN SAFETY
Tracking Number
0005072
Total Compensation
$715,108.86
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
RRFB PEDESTRIAN SAFETY October 31, 2025 <br />STATE FUND # HLP-PB25(004) <br />WO 3807 <br />Page 3 of 82 <br />1 All references to the terms State or state shall be revised to read Contracting Agency <br />2 unless the reference is to an administrative agency of the State of Washington, a State <br />3 statute or regulation, or the context reasonably indicates otherwise. <br />4 <br />5 All references to State Materials Laboratory shall be revised to read Contracting <br />6 Agency designated location. <br />7 <br />8 All references to final contract voucher certification shall be interpreted to mean the <br />9 Contracting Agency form(s) by which final payment is authorized, and final completion <br />10 and acceptance granted. <br />11 <br />12 Additive <br />13 A supplemental unit of work or group of bid items, identified separately in the Bid <br />14 Proposal, which may, at the discretion of the Contracting Agency, be awarded in addition <br />15 to the base bid. <br />16 <br />17 Alternate <br />18 One of two or more units of work or groups of bid items, identified separately in the Bid <br />19 Proposal, from which the Contracting Agency may make a choice between different <br />20 methods or material of construction for performing the same work. <br />21 <br />22 Business Day <br />23 A business day is any day from Monday through Friday except holidays as listed in <br />24 Section 1-08.5. <br />25 <br />26 Contract Bond <br />27 The definition in the Standard Specifications for Contract Bond applies to whatever bond <br />28 form(s) are required by the Contract Documents, which may be a combination of a <br />29 Payment Bond and a Performance Bond. <br />30 <br />31 Contract Documents <br />32 See definition for Contract. <br />33 <br />34 Contract Time <br />35 The period of time established by the terms and conditions of the Contract within which <br />36 the Work must be physically completed. <br />37 <br />38 Notice of Award <br />39 The written notice from the Contracting Agency to the successful Bidder signifying the <br />40 Contracting Agencys acceptance of the Bid Proposal. <br />41 <br />42 Notice to Proceed <br />43 The written notice from the Contracting Agency or Engineer to the Contractor authorizing <br />44 and directing the Contractor to proceed with the Work and establishing the date on which <br />45 the Contract time begins. <br />46 <br />47 Traffic <br />48 Both vehicular and non-vehicular traffic, such as pedestrians, bicyclists, wheelchairs, and <br />49 equestrian traffic. <br />50
The URL can be used to link to this page
Your browser does not support the video tag.