My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Earthwork Solutions, LLC 1/14/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Earthwork Solutions, LLC 1/14/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2026 2:09:51 PM
Creation date
1/14/2026 2:01:24 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthwork Solutions, LLC
Approval Date
1/14/2026
Council Approval Date
1/7/2026
Department
Public Works
Department Project Manager
Laura Claywell
Subject / Project Title
RRFB PEDESTRIAN SAFETY
Tracking Number
0005072
Total Compensation
$715,108.86
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
RRFB PEDESTRIAN SAFETY October 31, 2025 <br />STATE FUND # HLP-PB25(004) <br />WO 3807 <br />Page 13 of 82 <br />1 1-05.7.RTF <br />2 1-05.7 Removal of Defective and Unauthorized Work <br />3 (October 1, 2005 APWA GSP) <br />4 <br />5 Supplement this section with the following: <br />6 <br />7 If the Contractor fails to remedy defective or unauthorized work within the time specified in <br />8 a written notice from the Engineer, or fails to perform any part of the work required by the <br />9 Contract Documents, the Engineer may correct and remedy such work as may be <br />10 identified in the written notice, with Contracting Agency forces or by such other means as <br />11 the Contracting Agency may deem necessary. <br />12 <br />13 If the Contractor fails to comply with a written order to remedy what the Engineer <br />14 determines to be an emergency situation, the Engineer may have the defective and <br />15 unauthorized work corrected immediately, have the rejected work removed and replaced, <br />16 or have work the Contractor refuses to perform completed by using Contracting Agency or <br />17 other forces. An emergency situation is any situation when, in the opinion of the Engineer, <br />18 a delay in its remedy could be potentially unsafe, or might cause serious risk of loss or <br />19 damage to the public. <br />20 <br />21 Direct or indirect costs incurred by the Contracting Agency attributable to correcting and <br />22 remedying defective or unauthorized work, or work the Contractor failed or refused to <br />23 perform, shall be paid by the Contractor. Payment will be deducted by the Engineer from <br />24 monies due, or to become due, the Contractor. Such direct and indirect costs shall include <br />25 in particular, but without limitation, compensation for additional professional services <br />26 required, and costs for repair and replacement of work of others destroyed or damaged by <br />27 correction, removal, or replacement of the Contractors unauthorized work. <br />28 <br />29 No adjustment in contract time or compensation will be allowed because of the delay in <br />30 the performance of the work attributable to the exercise of the Contracting Agencys rights <br />31 provided by this Section. <br />32 <br />33 The rights exercised under the provisions of this section shall not diminish the Contracting <br />34 Agencys right to pursue any other avenue for additional remedy or damages with respect <br />35 to the Contractors failure to perform the work as required. <br />36 <br />37 <br />38 1-05.11.RTF <br />39 1-05.11 Final Inspection <br />40 <br />41 Delete this section and replace it with the following: <br />42 <br />43 1-05.11 Final Inspections and Operational Testing <br />44 (October 1, 2005 APWA GSP) <br />45 <br />46 1-05.11(1) Substantial Completion Date <br />47 <br />48 When the Contractor considers the work to be substantially complete, the Contractor shall <br />49 so notify the Engineer and request the Engineer establish the Substantial Completion <br />50 Date. The Contractors request shall list the specific items of work that remain to be <br />51 completed in order to reach physical completion. The Engineer will schedule an <br />52 inspection of the work with the Contractor to determine the status of
The URL can be used to link to this page
Your browser does not support the video tag.