My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Earthwork Solutions, LLC 1/14/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Earthwork Solutions, LLC 1/14/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2026 2:09:51 PM
Creation date
1/14/2026 2:01:24 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthwork Solutions, LLC
Approval Date
1/14/2026
Council Approval Date
1/7/2026
Department
Public Works
Department Project Manager
Laura Claywell
Subject / Project Title
RRFB PEDESTRIAN SAFETY
Tracking Number
0005072
Total Compensation
$715,108.86
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
RRFB PEDESTRIAN SAFETY October 31, 2025 <br />STATE FUND # HLP-PB25(004) <br />WO 3807 <br />Page 20 of 82 <br />1 1-07.5.GR1 <br />2 Environmental Regulations <br />3 <br />4 1-07.5.INST1.GR1 <br />5 Section 1-07.5 is supplemented with the following: <br />6 <br />7 1-07.5.OPT1.GR1 <br />8 (September 20, 2010) <br />9 Environmental Commitments <br />10 The following Provisions summarize the requirements, in addition to those required <br />11 elsewhere in the Contract, imposed upon the Contracting Agency by the various <br />12 documents referenced in the Special Provision Permits and Licenses. Throughout the <br />13 work, the Contractor shall comply with the following requirements: <br />14 <br />15 1-07.5.OPT2.GR1 <br />16 (August 3, 2009) <br />17 Payment <br />18 All costs to comply with this special provision for the environmental commitments and <br />19 requirements are incidental to the contract and are the responsibility of the Contractor. <br />20 The Contractor shall include all related costs in the associated bid prices of the contract. <br />21 <br />22 1-07.7.GR1 <br />23 Load Limits <br />24 <br />25 1-07.7.INST1.GR1 <br />26 Section 1-07.7 is supplemented with the following: <br />27 <br />28 1-07.7.OPT6.GR1 <br />29 (March 13, 1995) <br />30 If the sources of materials provided by the Contractor necessitates hauling over roads <br />31 other than State Highways, the Contractor shall, at the Contractor’s expense, make all <br />32 arrangements for the use of the haul routes. <br />33 <br />34 1-07.8.GR1 <br />35 High-Visibility Apparel <br />36 <br />37 1-07.8.INST1.GR1 <br />38 The third and fourth paragraphs of Section 1-07.8 are revised to read <br />39 <br />40 1-07.8.OPT1.2026.GR1 <br />41 (November 4, 2024) <br />42 High-visibility garments shall always be the outermost garments worn in a manner to <br />43 ensure 360 degrees of uninterrupted background and retroreflective material encircling the <br />44 torso. <br />45 <br />46 High-visibility garments shall be labeled as, and in a condition compliant with the <br />47 ANSI/ISEA 107-2015 publication entitled American National Standard for High-Visibility <br />48 Safety Apparel and Accessories, or equivalent revisions. <br />49
The URL can be used to link to this page
Your browser does not support the video tag.