My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Earthwork Solutions, LLC 1/14/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Earthwork Solutions, LLC 1/14/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2026 2:09:51 PM
Creation date
1/14/2026 2:01:24 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthwork Solutions, LLC
Approval Date
1/14/2026
Council Approval Date
1/7/2026
Department
Public Works
Department Project Manager
Laura Claywell
Subject / Project Title
RRFB PEDESTRIAN SAFETY
Tracking Number
0005072
Total Compensation
$715,108.86
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
RRFB PEDESTRIAN SAFETY October 31, 2025 <br />STATE FUND # HLP-PB25(004) <br />WO 3807 <br />Page 22 of 82 <br />1 submitted to the Engineer and to the State L&I online Prevailing Wage Intent & Affidavit <br />2 (PWIA) system. When apprenticeship is a requirement of the contract, include in PWIA all <br />3 apprentices. <br />4 <br />5 1-07.11.GR1 <br />6 Requirements for Nondiscrimination <br />7 <br />8 1-07.11.INST1.GR1 <br />9 Section 1-07.11 is supplemented with the following: <br />10 <br />11 1-07.11.OPT1.GR1 <br />12 (May 5, 2025) <br />13 Requirement for Affirmative Action to Ensure Equal Employment Opportunity <br />14 <br />15 In accordance with 41 CFR § 60-4.2, the clauses contained in 1-4 below are required to <br />16 be included in this Contract. Nothing in this contract alters the Contractors responsibility <br />17 to comply with all applicable Federal regulations, including but not limited to 41 CFR part <br />18 60 as currently existing or later amended. <br />19 <br />20 1. The Contractor’s attention is called to the Equal Opportunity Clause and the Standard <br />21 Federal Equal Employment Opportunity Construction Contract Specifications set <br />22 forth herein. <br />23 <br />24 2. The goals and timetables for minority and female participation set by the Office of <br />25 Federal Contract Compliance Programs, expressed in percentage terms for the <br />26 Contractor’s aggregate work force in each construction craft and in each trade on all <br />27 construction work in the covered area, are as follows: <br />28 <br />29 Women - Statewide <br />30 <br />31 Timetable Goal <br />32 <br />33 Until further notice 6.9% <br />34 Minorities - by Standard Metropolitan Statistical Area (SMSA) <br />35 <br />36 Spokane, WA: <br />37 SMSA Counties: <br />38 Spokane, WA 2.8 <br />39 WA Spokane. <br />40 Non-SMSA Counties 3.0 <br />41 WA Adams; WA Asotin; WA Columbia; WA Ferry; WA Garfield; WA <br />42 Lincoln, WA Pend Oreille; WA Stevens; WA Whitman. <br />43 <br />44 Richland, WA <br />45 SMSA Counties: <br />46 Richland Kennewick, WA 5.4 <br />47 WA Benton; WA Franklin. <br />48 Non-SMSA Counties 3.6 <br />49 WA Walla Walla. <br />50
The URL can be used to link to this page
Your browser does not support the video tag.