Earthwork Solutions, LLC 1/14/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Earthwork Solutions, LLC 1/14/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2026 2:09:51 PM
Creation date
1/14/2026 2:01:24 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthwork Solutions, LLC
Approval Date
1/14/2026
Council Approval Date
1/7/2026
Department
Public Works
Department Project Manager
Laura Claywell
Subject / Project Title
RRFB PEDESTRIAN SAFETY
Tracking Number
0005072
Total Compensation
$715,108.86
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
RRFB PEDESTRIAN SAFETY October 31, 2025 <br />STATE FUND # HLP-PB25(004) <br />WO 3807 <br />Page 39 of 82 <br />1 Contractor desires different than the normal working hours stated above, the request must <br />2 be submitted in writing prior to the preconstruction conference, subject to the provisions <br />3 below. The working hours for the Contract shall be established at or prior to the <br />4 preconstruction conference. <br />5 <br />6 All working hours and days are also subject to local permit and ordinance conditions (such <br />7 as noise ordinances). <br />8 <br />9 If the Contractor wishes to deviate from the established working hours, the Contractor <br />10 shall submit a written request to the Engineer for consideration. This request shall state <br />11 what hours are being requested, and why. Requests shall be submitted for review no <br />12 later than ***72 hours for day work and 30 days for night work*** prior to the day(s) the <br />13 Contractor is requesting to change the hours. <br />14 <br />15 If the Contracting Agency approves such a deviation, such approval may be subject to <br />16 certain other conditions, which will be detailed in writing. For example: <br />17 1. On non-Federal aid projects, requiring the Contractor to reimburse the Contracting <br />18 Agency for the costs in excess of straight-time costs for Contracting Agency <br />19 representatives who worked during such times. (The Engineer may require <br />20 designated representatives to be present during the work. Representatives who <br />21 may be deemed necessary by the Engineer include, but are not limited to: survey <br />22 crews; personnel from the Contracting Agencys material testing lab; inspectors; <br />23 and other Contracting Agency employees or third party consultants when, in the <br />24 opinion of the Engineer, such work necessitates their presence.) <br />25 2. Considering the work performed on Saturdays, Sundays, and holidays as working <br />26 days with regard to the contract time. <br />27 3. Considering multiple work shifts as multiple working days with respect to contract <br />28 time even though the multiple shifts occur in a single 24-hour period. <br />29 4. If a 4-10 work schedule is requested and approved the non working day for the <br />30 week will be charged as a working day. <br />31 5. If Davis Bacon wage rates apply to this Contract, all requirements must be met and <br />32 recorded properly on certified payroll <br />33 <br />34 1-08.1.OptionA.RTF <br />35 1-08.1 Subcontracting <br />36 (December 30, 2022 APWA GSP, Option A) <br />37 <br />38 Section 1-08.1 is supplemented with the following: <br />39 <br />40 Prior to any subcontractor or lower tier subcontractor beginning work, the Contractor shall <br />41 submit to the Engineer a certification (WSDOT Form 420-004) that a written agreement <br />42 between the Contractor and the subcontractor or between the subcontractor and any <br />43 lower tier subcontractor has been executed. This certification shall also guarantee that <br />44 these subcontract agreements include all the documents required by the Special <br />45 Provision Federal Agency Inspection. <br />46 <br />47 A subcontractor or lower tier subcontractor will not be permitted to perform any work <br />48 under the contract until the following documents have been completed and submitted to <br />49 the Engineer: