Laserfiche WebLink
RRFB PEDESTRIAN SAFETY October 31, 2025 <br />STATE FUND # HLP-PB25(004) <br />WO 3807 <br />Page 40 of 82 <br />1 <br />2 1. Request to Sublet Work (WSDOT Form 421-012), and <br />3 <br />4 2. Contractor and Subcontractor or Lower Tier Subcontractor Certification for Federal-aid <br />5 Projects (WSDOT Form 420-004). <br />6 <br />7 The Contractor shall submit to the Engineer a completed Monthly Retainage Report <br />8 (WSDOT Form 272-065) within 15 calendar days after receipt of every monthly progress <br />9 payment until every subcontractor and lower tier subcontractors retainage has been <br />10 released. <br />11 <br />12 The Contractor’s records pertaining to the requirements of this Special Provision shall be <br />13 open to inspection or audit by representatives of the Contracting Agency during the life of <br />14 the contract and for a period of not less than three years after the date of acceptance of <br />15 the contract. The Contractor shall retain these records for that period. The Contractor <br />16 shall also guarantee that these records of all subcontractors and lower tier subcontractors <br />17 shall be available and open to similar inspection or audit for the same time period. <br />18 <br />19 1-08.1(3).GR1 <br />20 Subcontractor Approval <br />21 <br />22 1-08.1(3).INST1.GR1 <br />23 The second sentence in the first paragraph of Section 1-08.1(3) is revised to read: <br />24 <br />25 1-08.1(3).OPT1.GR1 <br />26 (November 4, 2024) <br />27 Each request to subcontract shall be submitted through Unifier, Request to Sublet. <br />28 <br />29 1-08.1(8)B.RTF <br />30 1-08.1(8)BClauses Required in Subcontracts of All Tiers <br />31 (November 25, 2024 APWA GSP) <br />32 Delete item 8 of the second paragraph of Section 1-08.1(8)B. <br />33 <br />34 1-08.3.GR1 <br />35 Progress Schedule <br />36 <br />37 1-08.3(2).GR1 <br />38 General Requirements <br />39 <br />40 F1-08.3(2)A.docx <br />41 1-08.3(2)A Type A Progress Schedule <br />42 (December 30, 2022 APWA GSP) <br />43 <br />44 Revise this section to read: <br />45 <br />46 The Contractor shall submit three copies of a Type A Progress Schedule no later than at <br />47 the preconstruction conference, or some other mutually agreed upon submittal time. The <br />48 schedule may be a critical path method (CPM) schedule, bar chart, or other standard <br />49 schedule format. Regardless of which format used, the schedule shall identify the critical