My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Earthwork Solutions, LLC 1/14/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Earthwork Solutions, LLC 1/14/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2026 2:09:51 PM
Creation date
1/14/2026 2:01:24 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthwork Solutions, LLC
Approval Date
1/14/2026
Council Approval Date
1/7/2026
Department
Public Works
Department Project Manager
Laura Claywell
Subject / Project Title
RRFB PEDESTRIAN SAFETY
Tracking Number
0005072
Total Compensation
$715,108.86
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
RRFB PEDESTRIAN SAFETY October 31, 2025 <br />STATE FUND # HLP-PB25(004) <br />WO 3807 <br />Page 41 of 82 <br />1 path. The Engineer will evaluate the Type A Progress Schedule and approve or return the <br />2 schedule for corrections within 15 calendar days of receiving the submittal. <br />3 <br />4 1-08.4.GR1 <br />5 Prosecution of Work <br />6 <br />7 1-08.5.GR1 <br />8 Time for Completion <br />9 <br />10 1-08.5.INST2.GR1 <br />11 Section 1-08.5 is supplemented with the following: <br />12 <br />13 F1-08.5.OPT7.FR1.docx <br />14 (March 13, 1995) <br />15 This project shall be physically completed within *** 44 *** working days. <br />16 <br />17 1-08.5.OptionA.RTF <br />18 1-08.5 Time for Completion <br />19 (November 25, 2024 APWA GSP, Option A) <br />20 <br />21 Revise the third and fourth paragraphs to read: <br />22 <br />23 Contract time shall begin on the first working day following the Notice to Proceed Date. <br />24 <br />25 Each working day shall be charged to the contract as it occurs, until the contract work is <br />26 physically complete. If substantial completion has been granted and all the authorized <br />27 working days have been used, charging of working days will cease. Each week the <br />28 Engineer will provide the Contractor a statement that shows the number of working days: <br />29 (1) charged to the contract the week before; (2) specified for the physical completion of <br />30 the contract; and (3) remaining for the physical completion of the contract. The statement <br />31 will also show the nonworking days and all partial or whole days the Engineer declares as <br />32 unworkable The statement will be identified as a Written Determination by the Engineer. If <br />33 the Contractor does not agree with the Written Determination of working days, the <br />34 Contractor shall pursue the protest procedures in accordance with Section 1-04.5. By <br />35 failing to follow the procedures of Section 1-04.5, the Contractor shall be deemed as <br />36 having accepted the statement as correct. If the Contractor is approved to work 10 hours <br />37 a day and 4 days a week (a 4-10 schedule) and the fifth day of the week in which a 4-10 <br />38 shift is worked would ordinarily be charged as a working day then the fifth day of that <br />39 week will be charged as a working day whether or not the Contractor works on that day. <br />40 <br />41 Revise the sixth paragraph to read: <br />42 <br />43 The Engineer will give the Contractor written notice of the completion date of the contract <br />44 after all the Contractors obligations under the contract have been performed by the <br />45 Contractor. The following events must occur before the Completion Date can be <br />46 established: <br />47 1. The physical work on the project must be complete; and <br />48 2. The Contractor must furnish all documentation required by the contract and required <br />49 by law, to allow the Contracting Agency to process final acceptance of the contract.
The URL can be used to link to this page
Your browser does not support the video tag.