RRFB PEDESTRIAN SAFETY October 31, 2025 <br />STATE FUND # HLP-PB25(004) <br />WO 3807 <br />Page 44 of 82 <br />1 of work will correspond with those estimates. Payment will be made on the basis of the <br />2 amount of work actually authorized by the Engineer. <br />3 <br />4 LLC 1-09.9(Payments).DOCX <br />5 1-09.9 Payments <br />6 (December 30, 2022 APWA GSP) <br />7 <br />8 Section 1-09.9 is revised to read: <br />9 <br />10 The basis of payment will be the actual quantities of Work performed according to the <br />11 Contract and as specified for payment. <br />12 <br />13 The Contractor shall submit a breakdown of the cost of lump sum bid items at the <br />14 Preconstruction Conference, to enable the Project Engineer to determine the Work <br />15 performed on a monthly basis. A breakdown is not required for lump sum items that <br />16 include a basis for incremental payments as part of the respective Specification. Absent a <br />17 lump sum breakdown, the Project Engineer will make a determination based on <br />18 information available. The Project Engineers determination of the cost of work shall be <br />19 final. <br />20 <br />21 Progress payments for completed work and material on hand will be based upon progress <br />22 estimates prepared by the Engineer. A progress estimate cutoff date will be established at <br />23 the preconstruction conference. <br />24 <br />25 The initial progress estimate will be made not later than 30 days after the Contractor <br />26 commences the work, and successive progress estimates will be made every month <br />27 thereafter until the Completion Date. Progress estimates made during progress of the <br />28 work are tentative, and made only for the purpose of determining progress payments. The <br />29 progress estimates are subject to change at any time prior to the calculation of the final <br />30 payment. <br />31 <br />32 The value of the progress estimate will be the sum of the following: <br />33 1. Unit Price Items in the Bid Form the approximate quantity of acceptable units of <br />34 work completed multiplied by the unit price. <br />35 2. Lump Sum Items in the Bid Form based on the approved Contractors lump sum <br />36 breakdown for that item, or absent such a breakdown, based on the Engineers <br />37 determination. <br />38 3. Materials on Hand 100 percent of invoiced cost of material delivered to Job site <br />39 or other storage area approved by the Engineer. <br />40 4. Change Orders entitlement for approved extra cost or completed extra work as <br />41 determined by the Engineer. <br />42 <br />43 Progress payments will be made in accordance with the progress estimate less: <br />44 1. Retainage per Section 1-09.9(1), on non FHWA-funded projects; <br />45 2. The amount of progress payments previously made; and <br />46 3. Funds withheld by the Contracting Agency for disbursement in accordance with the <br />47 Contract Documents. <br />48