Laserfiche WebLink
RRFB PEDESTRIAN SAFETY October 31, 2025 <br />STATE FUND # HLP-PB25(004) <br />WO 3807 <br />Page 48 of 82 <br />1 <br />2 <br />3 DIVISION2.GR2 <br />4 Division 2 <br />5 Earthwork <br />6 <br />7 2-01.GR2 <br />8 Clearing, Grubbing, and Roadside Cleanup <br />9 <br />10 2-01.1.INST1.GR2 <br />11 Section 2-01.1 is supplemented with the following: <br />12 <br />13 2-01.5.GR2 <br />14 Payment <br />15 <br />16 2-01.5.INST1.GR2 <br />17 The first and second paragraphs of Section 2-01.5 are revised to read: <br />18 <br />19 2-02.3(3).GR2 <br />20 Removal of Pavement, Sidewalks, Curbs, and Gutters <br />21 <br />22 COE 2-02.3(4).docx <br />23 (******) <br />24 <br />25 Section 2-02.3 is supplemented with the following: <br />26 <br />27 2-02.3(4) Saw-cutting <br />28 (City of Everett, May 21, 2018) <br />29 <br />30 Curb, gutter, sidewalk shall be saw cut full height and width. <br />31 <br />32 Asphalt shall be saw cut full depth. <br />33 <br />34 When the drawings indicate or the Engineer requires sawcutting pavement which <br />35 comprises of rigid base and asphalt overlay, the minimum saw cut-depth for the <br />36 rigid base shall be full depth. <br />37 <br />38 For rigid base constructed with mortared decorative or special pavement (e.g., <br />39 brick, cobblestone, paver block, etc.) or any combination of such materials the <br />40 depth shall be full thickness of the rigid base along a neat line with intent to <br />41 salvage as many special pavement units as possible. <br />42 <br />43 <br />44 GSL 2-02 SAWCUT.docx <br />45 2-02.5Payment <br />46 <br />47 Section 2-02.5 is supplemented with the following: <br />48