Laserfiche WebLink
RRFB PEDESTRIAN SAFETY October 31, 2025 <br />STATE FUND # HLP-PB25(004) <br />WO 3807 <br />Page 53 of 82 <br />1 <br />2 The unit contract price per ton for "HMA Class ‰ inch, PG 64-22" shall be full <br />3 compensation for all costs incurred to carry out the requirements of Section 5-04 except <br />4 for those costs included in other items which are included in this sub-section and which <br />5 are included in the proposal. <br />6 <br />7 All costs for Asphalt Tack Coat, Anti Stripping Additive, and Compaction Adjustment <br />8 shall be included in the unit contract price per ton of the HMA. <br />9 <br />10 <br />11 END DIVISION5.RTF <br />12 <br />13 <br />14 END DIVISION 5 <br />15