My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Earthwork Solutions, LLC 1/14/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Earthwork Solutions, LLC 1/14/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2026 2:09:51 PM
Creation date
1/14/2026 2:01:24 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthwork Solutions, LLC
Approval Date
1/14/2026
Council Approval Date
1/7/2026
Department
Public Works
Department Project Manager
Laura Claywell
Subject / Project Title
RRFB PEDESTRIAN SAFETY
Tracking Number
0005072
Total Compensation
$715,108.86
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
RRFB PEDESTRIAN SAFETY October 31, 2025 <br />STATE FUND # HLP-PB25(004) <br />WO 3807 <br />Page 54 of 82 <br />1 <br />2 <br />3 DIVISION8.GR8 <br />4 Division 8 <br />5 Miscellaneous Construction <br />6 <br />7 8-01.GR8 <br />8 Erosion Control and Water Pollution Control <br />9 <br />10 COE 8-04 Curbs.docx <br />11 8-04 CURBS, GUTTERS, AND SPILLWAYS <br />12 (******) <br />13 <br />14 SECTION 8-04.1 OF THE STANDARD SPECIFICATIONS IS DELETED AND REPLACED BY <br />15 THE FOLLOWING: <br />16 <br />17 8-04.1 Description <br />18 <br />19 "Cement Concrete Curb and Gutter Type A-1" and "Cement Concrete Curb Type E-1" <br />20 shall be in accordance with Section 8-04 of the Standard Specifications as modified in <br />21 these Special Provisions and shall conform to the Construction Plans and Standard <br />22 Drawings. <br />23 <br />24 SECTION 8-04.3(1) OF THE STANDARD SPECIFICATIONS IS SUPPLEMENTED BY THE <br />25 FOLLOWING: <br />26 <br />27 8-04.3 Construction Requirements <br />28 <br />29 8-04.3(1) Cement Concrete Curbs, Gutters, and Spillways <br />30 <br />31 Joints shall be dummy joints at a maximum spacing of 15’ with 1/2" through-expansion <br />32 joints at beginning of curves, at curb return tangency points, at each side of catch <br />33 basins, and at driveways. <br />34 <br />35 The subbase for curb and gutter sections shall be compacted to 95% density at <br />36 optimum moisture content before placing the curb and gutter. <br />37 <br />38 The top of the finished concrete shall not deviate more than 1/8" in 10’, nor the <br />39 alignment 1/4" in 10’. <br />40 <br />41 Where shown on the plans, or as directed by the Engineer, the concrete curb will be <br />42 depressed for wheelchair ramps and driveways, per Standard Drawing Nos. 307 <br />43 321. <br />44 <br />45 Cement concrete curbs shall be constructed where shown on plans or as directed by <br />46 the Engineer in accordance with Standard Drawing Nos. 307 311. <br />47
The URL can be used to link to this page
Your browser does not support the video tag.