Laserfiche WebLink
RRFB PEDESTRIAN SAFETY October 31, 2025 <br />STATE FUND # HLP-PB25(004) <br />WO 3807 <br />Page 55 of 82 <br />1 Pedestrian curbs, poured in place integral with ramp, shall be constructed where <br />2 shown on plans or as directed by the Engineer in accordance with Standard Drawing <br />3 Nos. 320 321. <br />4 <br />5 8-04.5 Payment <br />6 <br />7 SECTION 8-04.5 OF THE STANDARD SPECIFICATIONS IS SUPPLEMENTED WITH <br />8 THE FOLLOWING: <br />9 <br />10 <br />11 Payment will be made for each of the following bid items that may be included in the <br />12 proposal: <br />13 <br />14 Add the following items: <br />15 "Cement Concrete Curb and Gutter Type A-1," per linear foot. <br />16 "Cement Concrete Curb Type E-1," per linear foot. <br />17 <br />18 <br />19 "Cement Concrete Curb and Gutter Type A-1", "Cement Concrete Curb Type E-1", per <br />20 linear foot shall be full compensation for all labor, equipment, materials and incidentals, <br />21 including forms, necessary to perform the work. Installation of curb depressions for <br />22 driveway cuts and wheelchair ramps shall be incidental to these items and no separate <br />23 payment will be made. <br />24 <br />25 8-14.GR8 <br />26 Cement Concrete Sidewalks <br />27 <br />28 8-14.1.GR8 <br />29 Description <br />30 <br />31 8-14.3.GR8 <br />32 Construction Requirements <br />33 <br />34 8-14.3.INST1.GR8 <br />35 Section 8-14.3 is supplemented with the following: <br />36 <br />37 8-14.3.OPT3.GR8 <br />38 (January 7, 2019) <br />39 Layout and Conformance to Grades <br />40 Using the information provided in the Contract documents, the Contractor shall lay out, <br />41 grade, and form each new curb ramp, sidewalk, and curb and gutter. <br />42 <br />43 8-14.3(5).GR8 <br />44 Detectable Warning Surface <br />45 <br />46 LLC 8-14.3(6) CURB BIKE RAMP.docx <br />47 8-14.3(6) CURB RAMP <br />48 <br />49 SECTION 8-14.3(6) OF THE STANDARD SPECIFICATIONS IS NEW AND IS <br />50 SUPPLEMENTED WITH THE FOLLOWING: