My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Earthwork Solutions, LLC 1/14/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Earthwork Solutions, LLC 1/14/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2026 2:09:51 PM
Creation date
1/14/2026 2:01:24 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthwork Solutions, LLC
Approval Date
1/14/2026
Council Approval Date
1/7/2026
Department
Public Works
Department Project Manager
Laura Claywell
Subject / Project Title
RRFB PEDESTRIAN SAFETY
Tracking Number
0005072
Total Compensation
$715,108.86
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
RRFB PEDESTRIAN SAFETY October 31, 2025 <br />STATE FUND # HLP-PB25(004) <br />WO 3807 <br />Page 55 of 82 <br />1 Pedestrian curbs, poured in place integral with ramp, shall be constructed where <br />2 shown on plans or as directed by the Engineer in accordance with Standard Drawing <br />3 Nos. 320 321. <br />4 <br />5 8-04.5 Payment <br />6 <br />7 SECTION 8-04.5 OF THE STANDARD SPECIFICATIONS IS SUPPLEMENTED WITH <br />8 THE FOLLOWING: <br />9 <br />10 <br />11 Payment will be made for each of the following bid items that may be included in the <br />12 proposal: <br />13 <br />14 Add the following items: <br />15 "Cement Concrete Curb and Gutter Type A-1," per linear foot. <br />16 "Cement Concrete Curb Type E-1," per linear foot. <br />17 <br />18 <br />19 "Cement Concrete Curb and Gutter Type A-1", "Cement Concrete Curb Type E-1", per <br />20 linear foot shall be full compensation for all labor, equipment, materials and incidentals, <br />21 including forms, necessary to perform the work. Installation of curb depressions for <br />22 driveway cuts and wheelchair ramps shall be incidental to these items and no separate <br />23 payment will be made. <br />24 <br />25 8-14.GR8 <br />26 Cement Concrete Sidewalks <br />27 <br />28 8-14.1.GR8 <br />29 Description <br />30 <br />31 8-14.3.GR8 <br />32 Construction Requirements <br />33 <br />34 8-14.3.INST1.GR8 <br />35 Section 8-14.3 is supplemented with the following: <br />36 <br />37 8-14.3.OPT3.GR8 <br />38 (January 7, 2019) <br />39 Layout and Conformance to Grades <br />40 Using the information provided in the Contract documents, the Contractor shall lay out, <br />41 grade, and form each new curb ramp, sidewalk, and curb and gutter. <br />42 <br />43 8-14.3(5).GR8 <br />44 Detectable Warning Surface <br />45 <br />46 LLC 8-14.3(6) CURB BIKE RAMP.docx <br />47 8-14.3(6) CURB RAMP <br />48 <br />49 SECTION 8-14.3(6) OF THE STANDARD SPECIFICATIONS IS NEW AND IS <br />50 SUPPLEMENTED WITH THE FOLLOWING:
The URL can be used to link to this page
Your browser does not support the video tag.