Laserfiche WebLink
RRFB PEDESTRIAN SAFETY October 31, 2025 <br />STATE FUND # HLP-PB25(004) <br />WO 3807 <br />Page 58 of 82 <br />1 and a minimum power factor of 0.90. The EMC shall meet or exceed FCC CFR Part 15. <br />2 Transient voltages shall comply with ANSI C62.41 Cat. A. An integral surge protector shall <br />3 meet ANSI/IEEE C62.45, C62.41.2, IEC61000-4-2, and IEC 61000-4-4. Each luminaire shall <br />4 be provided with a standard 3 x 3 ANSI label indicating the wattage and the light source type <br />5 (LED), using black letters on a reflective white background. <br />6 <br />7 The finish shall be a fade and abrasion resistant, epoxy polyester powder coat with a light gray <br />8 color. The luminaire shall meet UL listing for wet locations and maintain an IP66 rating for the <br />9 optics compartment and an IP54 rating or better for the power compartment. <br />10 <br />11 The Street Luminaires shall meet or exceed the following initial delivered lumen output: <br />12 <br />13 <br />14 Large Luminaire (400W HPS relative equivalent): <br />15 Type 3 distribution:≥ 18,000 lumens <br />16 <br />17 The following listed fixtures meet the required specifications: <br />18 <br />19 <br />20 Large Luminaire: <br />21 <br />22 Type 3 distribution: <br />23 Leotek GCM3-60J-MV-40K-3R-GY-185-PCR7-4B-RWG-WL-BSK <br />24 Schreder SMART3-US-48L185-NW-T3M-SV-GY-D01-AA-AB <br />25 LED Roadway NXT-72M-5-7-3LB-7-GY-3-UL-X-4H-BIRD <br />26 <br />27 3807 CNH 8-20.3(1) CONTRACTING AGENCY OWNED EQUIPMENT.docx <br />28 8-20.3(1) General <br />29 <br />30 Section 8-20.3(1) is supplemented with the following: <br />31 <br />32 Contractor Owned Removals <br />33 All removals associated with an electrical system, which are not designated to remain <br />34 the property of the Contracting Agency, shall become the property of the Contractor <br />35 and shall be removed from the project. All concrete signal poles, luminaires, and <br />36 other equipment not listed above shall be the property of the contractor and removed <br />37 from the project. <br />38 <br />39 The Contractor shall: <br />40 <br />41 Remove all wires for discontinued circuits from the conduit system. <br />42 <br />43 Remove elbow sections of abandoned conduit entering junction boxes. <br />44 <br />45 Abandoned conduit encountered during excavation shall be removed to the nearest <br />46 outlets or as directed by the Engineer. <br />47 <br />48 Remove foundations entirely, unless the Plans state otherwise. <br />49 <br />50 Backfill voids created by removal of foundations and junction boxes. Backfilling and <br />51 compaction shall be performed in accordance with Section 2-09.3(1)E. <br />52