Laserfiche WebLink
RRFB PEDESTRIAN SAFETY October 31, 2025 <br />STATE FUND # HLP-PB25(004) <br />WO 3807 <br />Page 67 of 82 <br />1 Where shown in the Plans or ordered by the Engineer, the existing signs and, if so <br />2 indicated, the sign structures shall be removed by the Contractor. Where indicated, <br />3 the Contractor shall remove concrete pedestals to a minimum of 1 foot below finished <br />4 grade and backfill the hole to the satisfaction of the Engineer. Where an existing sign <br />5 post is located within a sidewalk area, the Contractor shall remove the post and finish <br />6 the area to make the sidewalk continuous. Wood signs, wood sign posts, wood <br />7 structures, metal sign posts, windbeams, and other metal structural members shall <br />8 become the property of the Contractor and shall be removed from the project. <br />9 Aluminum signs shall remain the property of the City of Everett. <br />10 <br />11 <br />12 3807 KEL 8-22 BIKE PAVEMENT MARKING.docx <br />13 8-22 PAVEMENT MARKING <br />14 (******) <br />15 <br />16 Section 8-22 of the Standard Specification is supplemented by the following: <br />17 <br />18 8-22.2 Materials <br />19 <br />20 All plastic marking shall be Type B or Type D plastic. Spray Type D is not allowed. <br />21 <br />22 Where called for in the plans, green color pavement markings shall meet the <br />23 requirements of MUTCD Interim Approval for Optional Use of Green Colored <br />24 Pavement for Bike Lanes, IA-14. The color shall be green and will comply with FHWA <br />25 standards for daytime and nighttime chromaticity values. <br />26 <br />27 a.The daytime chromaticity coordinates for the color used for green colored <br />28 pavement shall be as follows: <br />29 <br />1 2 3 4 <br />x <br />0.230 <br />y <br />0.754 <br />x <br />0.266 <br />y <br />0.500 <br />x <br />0.367 <br />y <br />0.500 <br />x <br />0.444 <br />y <br />0.555 <br />30 <br />31 b.The daytime luminance factor (Y) shall be at least 7, but no more than 35. <br />32 <br />33 c.The nighttime chromaticity coordinates for the color used for <br />34 green colored pavement shall be as follows: <br />35 <br />1 2 3 4 <br />x <br />0.230 <br />y <br />0.754 <br />x <br />0.336 <br />y <br />0.540 <br />x <br />0.457 <br />y <br />0.500 <br />x <br />0.479 <br />y <br />0.520 <br />36 <br />37 <br />38 8-22.3 Construction Requirements <br />39 <br />40 Pavement markings shall be installed in accordance with Section 8-22.3 of the Standard <br />41 Specifications with the following modifications: <br />42