My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Earthwork Solutions, LLC 1/14/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Earthwork Solutions, LLC 1/14/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2026 2:09:51 PM
Creation date
1/14/2026 2:01:24 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthwork Solutions, LLC
Approval Date
1/14/2026
Council Approval Date
1/7/2026
Department
Public Works
Department Project Manager
Laura Claywell
Subject / Project Title
RRFB PEDESTRIAN SAFETY
Tracking Number
0005072
Total Compensation
$715,108.86
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
RRFB PEDESTRIAN SAFETY October 31, 2025 <br />STATE FUND # HLP-PB25(004) <br />WO 3807 <br />Page 68 of 82 <br />1 1) All Stop Line shall be 24 wide Type D extruded plastic flat line. Spray Type D is <br />2 not allowed. <br />3 2) Access parking space symbols, arrows, letters, and speed hump symbols shall be <br />4 Type D extruded plastic flat line. Spray Type D is not allowed. <br />5 3) All Crosswalk Line shall be solid white lines, 24 wide, installed in accordance with <br />6 City of Everett Standard Drawing No. 721 and shall be Type D extruded plastic flat <br />7 line. Spray Type D is not allowed. <br />8 4) All two-way left turn yellow lines and lane lines dividing two opposing directions of <br />9 travel shall be Type D plastic flat line. <br />10 5) Profiled plastic Type D material, where called for in the plans, shall be used for <br />11 lane line dividing traffic in the same direction of travel including plastic skip white <br />12 lane line, and solid white edge line, or other lines staked by the Engineer. <br />13 6) All white parking lines shall be shall be Type D plastic flat line. <br />14 7) All wide line and dotted extension line shall be Type D plastic flat line. <br />15 8) Plastic Crosswalk Line Green shall be solid green lines, 24 wide, installed in <br />16 accordance with the plans and shall be Type B Pre-formed fused thermoplastic. <br />17 9) Painted Curb at raised median island shall be approved traffic paint yellow in color, <br />18 solid line in pattern, two full coats in application, and shall cover both the vertical <br />19 6 face and the horizontal 6 surface of the curb at both ends of the island. The <br />20 second coat shall have glass traffic paint beads uniformly sprinkled in the wet paint <br />21 at the rate of 12 pounds per 100 linear feet of curbing and must be applied as <br />22 specified in Section 8-22.3(3)G. <br />23 <br />24 8-22.4 Measurement <br />25 <br />26 Stop Line will be measured by the linear foot of 24 wide marking installed. <br />27 <br />28 The measurement for Plastic Crosswalk Line Green will be based on the total square <br />29 feet installed of the green pavement marking only. <br />30 <br />31 The measurement for Painted Curb will be per linear foot of curb. <br />32 <br />33 <br />34 8-22.5 Payment <br />35 <br />36 Section 8-22 is supplemented read as follows: <br />37 <br />38 Plastic Crosswalk Line Green, per square foot. <br />39 Painted Curb, per linear foot. <br />40 <br />41 CNH 8-26 POLICE OFFICER.RTF <br />42 8-26 UNIFORMED POLICE OFFICER <br />43 Section 8-26 is vacant and is replaced with the following:
The URL can be used to link to this page
Your browser does not support the video tag.