My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jacobs Engineering Group, Inc. 1/23/2026
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Jacobs Engineering Group, Inc. 1/23/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2026 4:00:16 PM
Creation date
1/23/2026 3:58:03 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Jacobs Engineering Group, Inc.
Approval Date
1/23/2026
Council Approval Date
12/17/2025
End Date
12/31/2028
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
41st Street to Rucker Avenue Corridor Phase 2
Tracking Number
0005085
Total Compensation
$2,649,646.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Exhibit A (Scope of Work) <br />Consultant will reasonably rely upon the accuracy, timeliness, and completeness of the <br />information provided by the utility locating service. <br />Assumptions: <br />• Franchise utilities are typically marked by the franchise. <br />• Underground utilities to be mapped include power, natural gas, water, fiber optic <br />line, cable TV, telephone, and traffic. <br />• Surface Observable to include power poles, vaults, risers, fire hydrants, water <br />valves/meters, gas valves, traffic signal/traffic control boxes, and overhead utility <br />lines. <br />• Stormwater structures – The center of rims on catch basins and storm drain <br />manholes will be collected. <br />• Sanitary sewer structures – The center of rims on sewer manholes will be <br />collected. <br />• Pipe invert elevations are a part of the scope of services. <br />Right-of-Way Mapping <br />Consultant will identify and include property boundaries and right-of-way lines in the <br />survey. Information from property records obtained by the consult and provided by the <br />City will be combined by calculations with property corners found during field survey, to <br />align the property boundary mosaic to the Project datum. Property boundaries for <br />impacted land parcels by design and adjacent rights of way will be resolved and <br />incorporated into the mapping and drawing products listed herein. Assumed 10 land <br />parcels will be impacted requiring review of title reports and resolution of property <br />boundaries. Legal Descriptions and Exhibit drawings will be created to support land <br />acquisition of property and easement to support design elements impacting land <br />parcels. <br />Assumptions: <br />• City will obtain all necessary permits and approvals required for the survey work <br />in compliance with local and state regulations. <br />• The survey team will implement stringent quality control measures to ensure <br />accuracy and reliability of survey data. <br />• City will provide title reports with full supporting documents to support the <br />calculation of available right-of-way and easement locations. <br />• Traffic control, if required, will be a uniformed officer and billed as an invoiced <br />direct cost as an additional item. <br />• Measurement of tree driplines/canopies are not a part of the scope services. <br />Tree Tags are not a part of the scope of services.
The URL can be used to link to this page
Your browser does not support the video tag.