My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jacobs Engineering Group, Inc. 1/23/2026
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Jacobs Engineering Group, Inc. 1/23/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2026 4:00:16 PM
Creation date
1/23/2026 3:58:03 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Jacobs Engineering Group, Inc.
Approval Date
1/23/2026
Council Approval Date
12/17/2025
End Date
12/31/2028
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
41st Street to Rucker Avenue Corridor Phase 2
Tracking Number
0005085
Total Compensation
$2,649,646.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Exhibit A (Scope of Work) <br />Task 13 – Preliminary Design (30%) Plans and Estimate <br />Submittal <br />This task includes preparation of design roll plots, and an opinion of cost estimate <br />based on the preferred alternative roadway improvements. <br />30% Plans <br />Consultant design team will prepare 30% design level roll plots and submit them to the <br />City. The design will be prepared to City CAD standards and to a level of competency <br />presently maintained by practicing professionals in the field of transportation <br />engineering in the Puget Sound Region. <br />It is anticipated that the 30% roll plots will consist of the following design elements: <br />• Alignment and Preliminary ROW <br />• Site Preparation <br />• Channelization <br />• Roadway Improvements <br />• Drainage Improvements <br />• Traffic Signal Improvements <br />• Lighting and ITS Improvements <br />30% Opinion of Cost Estimate <br />Consultant design team will calculate 30% design level quantities and prepare an <br />opinion of construction costs based upon the 30% construction plans and current unit <br />bid prices. A contingency will be included to accommodate additional construction costs <br />not yet specifically identified. Some lump sum and/or square-foot costs will be used for <br />estimating portions of Project costs at this design level. <br />30% QA/QC of Deliverables <br />An internal Consultant quality assurance/quality control review of deliverables will be <br />conducted prior to submittal to the City. <br />Assumptions: <br />• The City will finalize the general geometric layout of the proposed improvements <br />through the review of the 30% submittal. The layout will not be substantially <br />modified in a later design phase. A substantial change in the layout will constitute <br />a change in scope and will allow Consultant to negotiate additional compensation <br />for the change. <br />• City will provide estimate template for the opinion of cost.
The URL can be used to link to this page
Your browser does not support the video tag.