My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction, Inc. 1/29/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Interwest Construction, Inc. 1/29/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2026 11:51:38 AM
Creation date
1/29/2026 11:51:14 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction, Inc.
Approval Date
1/29/2026
Council Approval Date
1/7/2026
Department
Public Works
Department Project Manager
Candice Au-Yeung
Subject / Project Title
36th ST CSO Storage Improvements
Tracking Number
0005068
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
00 52 13 - 1 <br />CONTRACT <br />THIS CONTRACT is made and entered by and between the City of Everett, Washington, a <br />municipal corporation existing under the laws of the State of Washington (the “City”) and <br />Interwest Construction, Inc. (the “Contractor”). <br />In consideration of the sums to be paid to it by the City, Contractor hereby covenants and agrees <br />to furnish all labor, tools, materials, equipment, and supplies required to complete in a <br />workmanlike manner the work, improvements, and/or appurtenances in accordance with the <br />Specifications and Drawings and all other Contract Documents entitled: “Everett 36th Street CSO <br />Storage Improvements” (the “Project”). <br />1. Contract Documents. The “Contract Documents” are defined in the General Conditions. <br />The Contract Documents are part of this Contract and are hereby incorporated by reference. <br />Terms that are capitalized in a Contract Document but not defined in that Contract Document <br />shall have the meaning defined to them in the other Contract Documents. A copy of the <br />Contract Documents that were posted for the Project on Builder’s Exchange of Washington <br />(www.bxwa.com) as of Bid Opening Date is maintained by the City Clerk’s Office as a single pdf <br />and is available as follows: <br />Link to <br />PDF <br />https://lfportal.everettwa.gov/WebLink/DocView.aspx?id=2052152&searchid=70ef052c- <br />ee6e-4faa-9b9f-1399aa94845a&dbid=0 <br />This is a 1625-page pdf with the first page containing City Clerk’s file recordkeeping <br />digital signature 2026.01.12 10:41:37 -08’00’ <br />Contractor acknowledges that Contractor has downloaded and reviewed this pdf prior to <br />signing this Contract. City and Contractor agree that this pdf contains all posted Contract <br />Documents as of the Bid Opening Date. City and Contractor further agree that this pdf may <br />contain some other documents (such as Reference Information) that are not Contract <br />Documents. <br />2.Contract Time. Substantial Completion of the Work shall be achieved within Eight <br />Hundred Twenty (820) calendar days after the effective date of the Notice to Proceed. Physical <br />Completion shall be within Thirty (30) calendar days after the actual date of issuance of <br />Substantial Completion. <br />3.Liquidated Damages. The parties agree the City will suffer damage and be put to <br />additional expense in the event that the Contractor does not complete the Work in all respects <br />and have it ready for use by the Substantial and Physical Completion dates stated above.
The URL can be used to link to this page
Your browser does not support the video tag.