Laserfiche WebLink
Exhibit A (Scope of Work) <br />SCOPE OF WORK <br />The City currently works with Northwest Corrosion Engineering (NWCE) to provide <br />evaluation of the cathodic protection and coating systems on City water and sewer <br />infrastructure, including large-diameter water transmission lines, water reservoirs, sewer <br />interceptors, and other corrosion-prone infrastructure. Due to an impending retirement <br />at NWCE, the City has selected Norton Corrosion Limited from the MRSC roster to <br />provide continuing cathodic protection evaluation services. <br /> <br />The scope of work includes the following: <br /> <br />• Provide staff and services on an on-call, as-needed basis. <br />• Provide in-house personnel for corrosion control, cathodic protection, and coating <br />evaluation services to ensure the longevity of City water and sewer infrastructure. <br />• Prior to mutual acceptance of a task assignment, prepare a Scope of Work and <br />written itemized cost estimate for the requested services. <br />Tasks anticipated to be completed under this contract include: <br />1. In early 2026, in coordination with NWCE, conduct a system-wide cathodic <br />protection assessment of all City water and sewer rectifiers, test stations, anode <br />junction boxes, bond boxes, etc. <br />2. Other support services will be on an as-needed basis and are anticipated to <br />include, but are not limited to: <br />a. Provide on-call coating inspection services <br />b. Provide on-call corrosion consulting services <br />The scope and fee for projects under this agreement shall be established separately for <br />each individual project using a Task Authorization form, provided as Exhibit A1. The <br />Service Provider may use its own Task Authorization form so long as it includes th e <br />same necessary information (scope, fee, signatures, dates, project name, etc.). The <br />Task Authorization form shall include a detailed scope of work and fee for each project <br />and shall be signed by both parties prior to the Service Provider performing any work <br />under this Agreement. The City does not guarantee that any work will be assigned to <br />the Service Provider under this Agreement, except that which is authorized using the <br />Task Authorization form. After both parties sign a Task Authorization form for a p roject, <br />it becomes part of this Agreement and is subject to the terms and conditions of this <br />Agreement. <br />