Laserfiche WebLink
NORTON GORROSION LIMITED <br />2026 Engineering Rate Schedule <br />Except Litigation and Expert Testimony <br />Effective January l, 2026 <br />Eneineering <br />Principal Engineer <br />Sr. Corrosion Engineer <br />Corrosion Engineer <br />Sr. Corrosion Technician <br />Corrosion Technician <br />Computer Services/CADD <br />Secretarial <br />Soil Testine <br />In-house lab- Simple soil and water lab <br />work- per test <br />Out-source lab- cost +15yo <br />Expenses- cost + l5% <br />Mileage- Personal Vehicle <br />C o n structio n/IVIate ri als <br />Construction Crew Time Total <br />Construction Foreman - Individual <br />Construction Laborer - Individual <br />Shop Labor Rate <br />Subcontractors + Equipment Rental <br />NCL Equipment <br />A. Concrete Saw <br />B. Concrete Saw <br />C. Core Drill4" <br />D. Core Drill8" <br />E . Backhoe or Excavator <br />G. Boat <br />Materials <br />IRS Standard <br />Mileage Rate + 15% <br />Crew days: l0 hour <br />work days <br />$2s3.00 <br />$24s.00 <br />$213.00 <br />$174.00 <br />$1s2.00 <br />$13s.00 <br />$99.00 <br />$97.00 <br />0.725 <br />$2,490.00 <br />$r39.00 <br />$l10.00 <br />$106.00 <br />$205.00 (load/unload) <br />$4.52 /single cut <br />$9.00 /double cut <br />$50.78 /hole <br />$101.19 /hole <br />$410.00 /day <br />$442.00 day <br />see Sales <br />(7) 2026A_Y ear{o-Year rate workup+proposed.xls 1t14t2026