My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Norton Corrosion Limited, LLC 2/2/2026
>
Contracts
>
Agreement
>
On-Call (not construction)
>
Norton Corrosion Limited, LLC 2/2/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2026 1:43:59 PM
Creation date
2/2/2026 1:43:31 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Norton Corrosion Limited, LLC
Approval Date
2/2/2026
End Date
12/31/2026
Department
Public Works
Department Project Manager
Emily Coba
Subject / Project Title
On-call Corrosion Control Services
Tracking Number
0005099
Total Compensation
$30,000.00
Contract Type
Agreement
Contract Subtype
On-Call (not construction)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
NORTON GORROSION LIMITED <br />2026 Engineering Rate Schedule <br />Except Litigation and Expert Testimony <br />Effective January l, 2026 <br />Eneineering <br />Principal Engineer <br />Sr. Corrosion Engineer <br />Corrosion Engineer <br />Sr. Corrosion Technician <br />Corrosion Technician <br />Computer Services/CADD <br />Secretarial <br />Soil Testine <br />In-house lab- Simple soil and water lab <br />work- per test <br />Out-source lab- cost +15yo <br />Expenses- cost + l5% <br />Mileage- Personal Vehicle <br />C o n structio n/IVIate ri als <br />Construction Crew Time Total <br />Construction Foreman - Individual <br />Construction Laborer - Individual <br />Shop Labor Rate <br />Subcontractors + Equipment Rental <br />NCL Equipment <br />A. Concrete Saw <br />B. Concrete Saw <br />C. Core Drill4" <br />D. Core Drill8" <br />E . Backhoe or Excavator <br />G. Boat <br />Materials <br />IRS Standard <br />Mileage Rate + 15% <br />Crew days: l0 hour <br />work days <br />$2s3.00 <br />$24s.00 <br />$213.00 <br />$174.00 <br />$1s2.00 <br />$13s.00 <br />$99.00 <br />$97.00 <br />0.725 <br />$2,490.00 <br />$r39.00 <br />$l10.00 <br />$106.00 <br />$205.00 (load/unload) <br />$4.52 /single cut <br />$9.00 /double cut <br />$50.78 /hole <br />$101.19 /hole <br />$410.00 /day <br />$442.00 day <br />see Sales <br />(7) 2026A_Y ear{o-Year rate workup+proposed.xls 1t14t2026
The URL can be used to link to this page
Your browser does not support the video tag.