My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, Inc. 2/4/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, Inc. 2/4/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2026 11:26:52 AM
Creation date
2/4/2026 11:05:46 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, Inc.
Approval Date
2/4/2026
Council Approval Date
1/28/2026
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Lenora Regional Stormwater Facility
Public Works WO Number
UP3792
Tracking Number
0005101
Total Compensation
$5,905,272.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
781
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Lenora Regional SW Facility ADVERTISEMENT FOR BIDS Nov. 2025 <br />Work Order # UP3792 SP - i <br />Category 2: For official use only / disclosure permissible by law. <br />Category 2: Sensitive information <br />TABLE OF CONTENTS <br />Item Page <br />TABLE OF CONTENTS .......................................................................................................................... i <br />ADVERTISEMENT FOR BIDS .............................................................................................................. xi <br />DIVISION P - PROPOSAL ................................................................................................................... xiii <br />BID SCHEDULE ............................................................................................................................. xv <br />PROPOSAL SIGNATURE SHEET ..................................................................................................... xxix <br />SUBCONTRACTORS FORM ............................................................................................................. xxxi <br />NON-COLLUSION AFFIDAVIT ......................................................................................................... xxxv <br />DIVISION B - BID ITEM DESCRIPTIONS ............................................................................................ xli <br />CONTRACT ............................................................................................................................ lxxi <br />DIVISION 1 GENERAL REQUIREMENTS ................................................................................. 1 <br />DESCRIPTION OF WORK ..................................................................................................................... 1 <br />1-01 DEFINITIONS AND TERMS .......................................................................................................... 2 <br />1-01.3 Definitions ................................................................................................................... 2 <br />1-02 BID PROCEDURES AND CONDITIONS .................................................................................. 7 <br />1-02.1 Bidder Responsibility Criteria ...................................................................................... 7 <br />1-02.2 Plans and Specifications ............................................................................................. 9 <br />1-02.4 Examination of Plans, Specifications, and Site of Work ........................................... 10 <br />1-02.5 Proposal Form .......................................................................................................... 11 <br />1-02.6 Preparation of Proposal ............................................................................................ 12 <br />1-02.7 Bid Deposit ................................................................................................................ 12 <br />1-02.8 Noncollusion Declaration and Lobbying Certification ............................................... 13 <br />1-02.9 Delivery of Proposal .................................................................................................. 13 <br />1-02.10 Withdrawing, Revising, or Supplementing Proposal ................................................. 13 <br />1-02.12 Public Opening of Proposals..................................................................................... 14 <br />1-02.13 Irregular Proposals .................................................................................................... 14 <br />1-02.14 Disqualification of Bidders ......................................................................................... 15 <br />1-02.15 Pre-Award Information .............................................................................................. 16 <br />1-03 AWARD AND EXECUTION OF CONTRACT ......................................................................... 16 <br />1-03.1 Consideration of Bids ................................................................................................ 16 <br />1-03.2 Award of Contract ..................................................................................................... 17 <br />1-03.3 Execution of Contract ................................................................................................ 17 <br />1-03.4 Contract Bond ........................................................................................................... 18 <br />1-03.5 Failure to Execute Contract ...................................................................................... 18 <br />1-03.6 Return of Bid Deposit ................................................................................................ 18 <br />1-03.7 Judicial Review ......................................................................................................... 19 <br />1-03.8 Third Party Beneficiary ............................................................................................. 19 <br />1-04 SCOPE OF THE WORK .......................................................................................................... 19 <br />1-04.1 Intent of the Contract ................................................................................................ 19 <br />1-04.2 Coordination of Contract Documents, Plans, Special Provisions Specifications, and <br />Addenda .................................................................................................................... 20 <br />1-04.3 Reference Information .............................................................................................. 21 <br />1-04.4 Changes .................................................................................................................... 21 <br />1-04.5 Notice by Contractor ................................................................................................. 23 <br />1-04.7 Differing Site Conditions (Changed Conditions) ....................................................... 25 <br />1-05 CONTROL OF WORK ............................................................................................................. 26 <br />1-05.1 City ............................................................................................................................ 26 <br />1-05.2 City’s Representative ................................................................................................ 28 <br />1-05.3 Working Drawings ..................................................................................................... 29 <br />1-05.4 Conformity With and Deviations From Plans and Stakes ......................................... 34 <br />1-05.6 Inspection of Work and Materials.............................................................................. 36
The URL can be used to link to this page
Your browser does not support the video tag.