My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, Inc. 2/4/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, Inc. 2/4/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2026 11:26:52 AM
Creation date
2/4/2026 11:05:46 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, Inc.
Approval Date
2/4/2026
Council Approval Date
1/28/2026
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Lenora Regional Stormwater Facility
Public Works WO Number
UP3792
Tracking Number
0005101
Total Compensation
$5,905,272.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
781
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Lenora Regional SW Facility Division P – Proposal Nov. 2025 <br />Work Order # UP3792 SP - xiii <br />Category 2: For official use only / disclosure permissible by law. <br />DIVISION P - PROPOSAL <br />CITY OF EVERETT, WASHINGTON <br />LENORA REGIONAL STORMWATER FACILITY <br />WORK ORDER # UP3792 <br />To the City Council <br />Everett, Washington <br /> <br /> <br />The undersigned Bidder declares that it has carefully examined the Notice to Contractors and the Contract Documents (including without limitation Plans and Specifications, Standard Specifications, Special Provisions, Appendix, Proposal, and Contract) for the construction of approximately 1,360+/- linear feet of storm piping that ranges from 8-inch to 60-inch diameter, a 2,850+/- s.f. stormwater treatment facility with liner and treatment media, 2,870+/- s.f. stormwater treatment facility with topsoil and no liner, concrete structures, concrete flow split structure, landscaping, pavement restoration, sidewalk repair and replacement, signing and striping and other such Work as may be necessary, in accordance with the Contract. The undersigned Bidder declares that the Bidder has made such investigations as are necessary to determine the conditions to be encountered, and that, if this Proposal is accepted, the undersigned will enter into a contract with the City of Everett, Washington, in the form of Contract hereto annexed, the undersigned will, to the extent required, provide the necessary equipment, tools, apparatus, and other means of construction, and the undersigned will furnish all labor and materials necessary to complete the Work in the manner herein specified and according to the requirements of the Engineer. <br /> <br />The undersigned Bidder certifies that this Proposal is in all respects fair and is made without collusion on the part of any person, firm or corporation mentioned below, and no officer or employee of the City of Everett is personally or financially interested, directly or indirectly, in the Proposal or in any purchase of or sale of any materials or supplies for the Work to which it relates, or any portion of the profits thereof. <br /> <br />The undersigned Bidder agrees that the undersigned will complete the Work in all respects as required by Division C, Section 2. Contract Time and that the Bidder will pay liquidated damages to the City in the amount specified <br />in the Contract Documents. <br /> <br />Accompanying this Proposal is a bid bond or certified check or cashier’s check in the amount of five percent (5%) <br />of the Proposal according to the conditions of the “Notice to Contractors” and “Division 1 - General <br />Requirements” hereby incorporated. If this Proposal shall be accepted by the City of Everett, Washington, and <br />the undersigned shall fail to execute a satisfactory contract and bond, as stated in the Division 1 – General <br />Requirements hereto incorporated, within 14 calendar days after the Award Date, then the City may, at its option, <br />determine that the undersigned has abandoned the Contract and the amount of the bid bond or certified check or <br />cashier’s check accompanying this Proposal shall be forfeited and become the property of the City of Everett, <br />Washington. <br />
The URL can be used to link to this page
Your browser does not support the video tag.