My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, Inc. 2/4/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, Inc. 2/4/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2026 11:26:52 AM
Creation date
2/4/2026 11:05:46 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, Inc.
Approval Date
2/4/2026
Council Approval Date
1/28/2026
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Lenora Regional Stormwater Facility
Public Works WO Number
UP3792
Tracking Number
0005101
Total Compensation
$5,905,272.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
781
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Lenora Regional SW Facility Division P – Proposal Nov. 2025 <br />Work Order # UP3792 SP - xv <br />Category 2: For official use only / disclosure permissible by law. <br />Note: Unit prices for all items, all extensions, and the total amount bid must be shown. Where conflict occurs between the unit <br />price and the total amount named for any item, the unit price shall prevail, and totals shall be corrected to conform thereto. All <br />entries must be typed or entered in ink. <br />BID SCHEDULE <br />BIDDER:___________________________ <br />Item <br />No. ITEM DESCRIPTION Unit Bid Qty UNIT PRICE TOTAL AMOUNT <br />Bid Schedule – Lenora Regional Stormwater <br />Facility <br /> <br />1 MOBILIZATION LS 1 $_______.___ $______________.___ <br />2 SURVEYING LS 1 $_______.___ $______________.___ <br />3 SPCC PLAN LS 1 $_______.___ $______________.___ <br />4 FORCE ACCOUNT FA 200,000 $ 1.00 $ 200,000.00 <br />5 POTHOLING EA 10 $_______.___ $______________.___ <br />6 TYPE B PROGRESS SCHEDULE LS 1 $_______.___ $______________.___ <br />7 <br />PROJECT TEMPORARY TRAFFIC <br />CONTROL LS 1 $_______.___ $______________.___ <br />8 <br />PORTABLE CHANGEABLE MESSAGE <br />SIGN HR 19,710 $_______.___ $______________.___ <br />9 CONSTRUCTION SIGN CLASS A SF 156 $_______.___ $______________.___ <br />10 TYPE II OR Type III BARRICADE EA 15 $_______.___ $_______.___ <br />11 CLEARING AND GRUBBING SY 7,346 $_______.___ $______________.___ <br />12 PROTECT EXISTING TREE EA 5 $_______.___ $______________.___ <br />13 <br />REMOVE, SALVAGE, AND DELIVER <br />EX. CONC. BARRIER EA 22 $_______.___ $______________.___ <br />14 <br />REMOVE EXISTING CURB AND <br />GUTTER LF 360 $_______.___ $______________.___ <br />15 <br />REMOVE CEMENT CONCRETE <br />SIDEWALK AND DRIVEWAY SY 200 $_______.___ $______________.___ <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.