Laserfiche WebLink
<br />Lenora Regional SW Facility Division P – Proposal Nov. 2025 <br />Work Order # UP3792 SP - xvii <br />Category 2: For official use only / disclosure permissible by law. <br />Item <br />No. ITEM DESCRIPTION Unit Bid Qty UNIT PRICE TOTAL AMOUNT <br />16 <br />REMOVE MANHOLE OR CATCH <br />BASIN EA 2 $_______.___ $______________.___ <br />17 <br />REMOVE EXISTING 8 IN. TO <br />12 IN. DIA PIPE LF 30 $_______.___ $______________.___ <br />18 <br />REMOVE EXISTING >12 IN. <br />TO <30 IN. DIA PIPE LF 340 $________ $_ ___ <br />19 <br />PLUG AND ABANDON <br />EXISTING PIPE 12 IN. TO 18 <br />IN. DIA. LF 265 $_______.___ $______________.___ <br />20 REMOVE EX. FIRE HYDRANT EA 1 $_______.___ $______________.___ <br />21 CONTROLLED DENSITY FILL CY 60 $_______.___ $______________.___ <br />22 UTILITY ADJUSTMENT FA 50,400 $______1.00__ $______50,400___ <br />23 SAWCUTTING CURB EA 8 $_______.___ $______________.___ <br />24 <br />SAWCUTTING RIGID <br />PAVEMENT LFI 160 $_______.___ $______________.___ <br />25 <br />SAWCUTTING FLEXIBLE <br />PAVEMENT LFI 5,900 $_______.___ $______________.___ <br />26 <br />ROADWAY EXCAVATION, <br />INCL. HAUL CY 881 $_______.___ $______________.___ <br />27 <br />REMOVE UNSUITABLE <br />FOUNDATION MATERIAL CY 710 $_______.___ $______________.___ <br />28 <br />REPLACE UNSUITABLE <br />FOUNDATION MATERIAL CY 710 $_______.___ $______________.___ <br />29 <br />GRADING AND SHAPING - SW <br />TREATMENT SITE LS 1 $_______.___ $______________.___ <br />30 GRAVEL BORROW, INCL. HAUL TON 5,202 $_______.___ $______________.___ <br />31 <br />GRANULAR BORROW, INCL. <br />HAUL TON 2,958 $_______.___ $______________.___ <br />32 <br />GRAVEL BACKFILL FOR PIPE <br />ZONE BEDDING, INCL, HAUL TON 2,754 $_______.___ $______________.___ <br />33 <br />ROADWAY SUBGRADE <br />PREPARATION SY 2,574 $_______.___ $______________.___ <br />34 <br />STRUCTURE EXC. CLASS A, <br />INCL. HAUL – LENORA FLOW <br />SPLIT VAULT CY 760 $_______.___ $______________.___ <br />35 <br />STRUCTURE EXC. CLASS A, <br />INCL. HAUL -SW TREATMENT CY 3,950 $_______.___ $______________.___ <br />36 <br />SHORING - FLOW SPLIT <br />VAULT LS 1 $_______.___ $______________.___ <br /> <br />