My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, Inc. 2/4/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, Inc. 2/4/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2026 11:26:52 AM
Creation date
2/4/2026 11:05:46 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, Inc.
Approval Date
2/4/2026
Council Approval Date
1/28/2026
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Lenora Regional Stormwater Facility
Public Works WO Number
UP3792
Tracking Number
0005101
Total Compensation
$5,905,272.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
781
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Lenora Regional SW Facility Division P – Proposal Nov. 2025 <br />Work Order # UP3792 SP - xix <br />Category 2: For official use only / disclosure permissible by law. <br />Item <br />No. ITEM DESCRIPTION Unit Bid Qty UNIT PRICE TOTAL AMOUNT <br />37 <br />DEWATERING STRUCTURES FLOW <br />SPLIT VAULT LS 1 $_______.___ $______________.___ <br />38 CRUSHED SURFACING TOP COURSE TON 517 $_______.___ $______________.___ <br />39 <br />CRUSHED SURFACING BASE <br />COURSE TON 457 $_______.___ $______________.___ <br />40 HMA CL. 1/2 IN. PG 64-22 TON 470 $_______.___ $______________.___ <br />41 POROUS GRAVEL AVEMENT SY 284 $_______.___ $______________.___ <br />42 RAILING, PEDESTRIAN GUARD LF 290 $_______.___ $______________.___ <br />43 <br />CONCRETE STRUCTURE – FLOW <br />SPLIT VAULT LS 1 $_______.___ $______________.___ <br />44 <br />REINF. CONC. WALLS - <br />STORMWATER FACILITY LS 1 $_______.___ $______________.___ <br />45 <br />REINF. CONC. WALLS - VIEWING <br />PLATFORM LS 1 $_______.___ $______________.___ <br />46 CONCRETE WALL TREATMENT SF 2,430 $_______.___ $______________.___ <br />47 STORM SEWER PIPE 8 IN. DIA. LF 10 $_______.___ $______________.___ <br />48 STORM SEWER PIPE 12 IN. DIA. LF 80 $_______.___ $______________.___ <br />49 STORM SEWER PIPE 18 IN. DIA. LF 410 $_______.___ $______________.___ <br />50 STORM SEWER PIPE 24 IN. DIA. LF 110 $_______.___ $______________.___ <br />51 STORM SEWER PIPE 48 IN. DIA. LF 525 $_______.___ $______________.___ <br />52 STORM SEWER PIPE 54 IN. DIA. LF 30 $_______.___ $______________.___ <br />53 STORM SEWER PIPE 60 IN. DIA. LF 105 $_______.___ $______________.___ <br />54 <br />DUCTILE IRON STORM SEWER PIPE <br />8 IN. DIA. LF 15 $_______.___ $______________.___ <br />55 <br />DUCTILE IRON STORM SEWER PIPE <br />12 IN. DIA. LF 70 $_______.___ $______________.___ <br />56 MANHOLE 48 IN. DIAM., TYPE 3 EA 3 $_______.___ $______________.___ <br />57 MANHOLE 72 IN. DIAM, TYPE 3 EA 10 $_______.___ $______________.___ <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.