My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, Inc. 2/4/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, Inc. 2/4/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2026 11:26:52 AM
Creation date
2/4/2026 11:05:46 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, Inc.
Approval Date
2/4/2026
Council Approval Date
1/28/2026
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Lenora Regional Stormwater Facility
Public Works WO Number
UP3792
Tracking Number
0005101
Total Compensation
$5,905,272.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
781
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Lenora Regional SW Facility Division P – Proposal Nov. 2025 <br />Work Order # UP3792 SP - xxi <br />Category 2: For official use only / disclosure permissible by law. <br />Item <br />No. ITEM DESCRIPTION Unit Bid Qty UNIT PRICE TOTAL AMOUNT <br />58 MANHOLE 96 IN. DIAM., TYPE 3 EA 1 $_______.___ $______________.___ <br />59 CATCH BASIN 48 IN. DIAM., TYPE 1 EA 1 $_______.___ $______________.___ <br />60 CATCH BASIN 48 IN. DIAM., TYPE 2 EA 6 $_______.___ $______________.___ <br />61 <br />STORMWATER PRETREATMENT <br />STRUCTURES EA 2 $_______.___ $______________.___ <br />62 <br />CONNECT STORM PIPE TO EX. MH, <br />CB EA 4 $_______.___ $______________.___ <br />63 CONNECT STORM PIPE TO EX. PIPE EA 1 $_______.___ $______________.___ <br />64 TRENCH EXCAVATION, INCL. HAUL CY 4,430 $_______.___ $______________.___ <br />65 <br />REMOVE UNSUITABLE PIPE <br />FOUNDATION MATERIAL CY 200 $_______.___ $______________.___ <br />66 <br />REPLACE UNSUITABLE PIPE <br />FOUNDATION MATERIAL CY 200 $_______.___ $______________.___ <br />67 PIPE PLUG, MECHANICAL EA 3 $_______.___ $______________.___ <br />68 TRENCH DAM (CUTOFF WALL) EA 18 $_______.___ $______________.___ <br />69 TRENCH DEWATERING LS 1 $_______.___ $______________.___ <br />70 <br />TRENCH EXCAVATION SAFETY <br />SYSTEM LS 1 $_______.___ $______________.___ <br />71 ADJACENT UTILITY SUPPORT LS 1 $_______.___ $______________.___ <br />72 DI PIPE FOR WATER MAIN 8-IN DIA LF 130 $_______.___ $______________.___ <br />73 GATE VALVE 8-IN EA 1 $_______.___ $______________.___ <br />74 HYDRANT ASSEMBLY EA 1 $_______.___ $______________.___ <br />75 <br />WATER SERVICE, 1-INCH – <br />RECONNECT EXISTING LS 1 $_______.___ $______________.___ <br />76 <br />WATER SERVICE, 2-INCH – SW <br />TREATMENT SITE LS 1 $_______.___ $______________.___ <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.